X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454212006003

Well Details

Well ID: 0454212006003
Loading map...
Location: 00/06-20-045-21W4/3
Location Alias: 00/06-20-45-21 W4M
Location Alias 2: 00/06-20-045-21 W4/03
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 21
Section: 20
County/Municipality: Camrose County
Well Name: CNRL DUHAMEL 6-20MU-45-21
Operator Name: Canadian Natural Resources Limited
License Number: 0005283
License Date: 1952-09-09
License Status: Suspension
Spud Date: 1952-09-14
Final Drill Date: 1952-10-02
Well Total Depth: 1473.10 m
Surface Hole Latitude: 52.893016
Surface Hole Longitude: -113.019395

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-09 Obtained License
1952-09-27 Drill Stem Test Performed
1952-09-28 Drill Stem Test Performed
1952-09-30 Drill Stem Test Performed
1952-10-01 Drill Stem Test Performed
1952-10-01 Perforation Treatment Performed - Jet Perforation
1952-10-02 Finished Drilling
1952-10-02 Well Mode changed to Drilled and Cased
1952-10-03 Production Casing Operation Performed
1952-10-07 Perforation Treatment Performed - Acid Wash - No Pressure
1953-04-27 Perforation Treatment Performed - Jet Perforation
1953-04-30 Perforation Treatment Performed - Acid Wash - No Pressure
1991-06-08 Perforation Treatment Performed - Jet Perforation
1991-06-08 Well Log Performed
1991-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-06-11 Perforation Treatment Performed - Jet Perforation
1991-06-11 Plug Back Performed
1991-06-11 Well Log Performed
1991-12-14 Perforation Treatment Performed - Jet Perforation
1991-12-14 Well Log Performed
1991-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-03 Plug Back Performed
1998-08-05 Perforation Treatment Performed - Jet Perforation
1998-08-05 Well Log Performed
1998-08-07 Well Began Production
1998-08-07 Well Fluid changed to Crude Oil
1998-08-07 Well Mode changed to Pumping
1999-04-24 Perforation Treatment Performed - Jet Perforation
1999-04-24 Well Log Performed
2017-01-31 Well Fluid changed to Crude Oil
2017-01-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-10-01 Perforation 1450.80 1457.60 20
1991-12-14 Perforation 1360.00 1361.50 13
1991-12-15 Acid Treatment 1354.00 1365.00 0
1992-07-03 Acid Treatment 1354.00 1365.00 0
1998-08-03 Packing Device Capped w/Cement 1339.00 1347.00 0
1998-08-05 Perforation 1302.10 1304.50 17
1999-04-24 Perforation 1298.50 1303.50 14
1952-10-07 Acid Wash 1450.80 1457.60 0
1953-04-27 Perforation 1367.00 1369.20 20
1953-04-30 Acid Wash 1367.00 1369.20 0
1991-06-08 Perforation 1445.60 1449.00 13
1991-06-11 Packing Device Capped w/Cement 1427.00 1435.00 0
1991-06-11 Perforation 1362.00 1365.00 13
1991-06-11 Acid Treatment 1362.00 1365.00 0
1991-12-14 Perforation 1354.00 1358.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 3483 0.0 0.0 0.0
1999 8567 0.0 0.0 0.0
2000 8567 0.0 0.0 0.0
2001 7224 0.0 0.0 0.0
2002 7718 0.0 0.0 0.0
2003 8471 0.0 0.0 0.0
2004 8511 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8711 0.0 0.0 0.0
2007 8504 0.0 0.0 0.0
2008 8729 0.0 0.0 0.0
2009 8639 0.0 0.0 0.0
2010 8743 0.0 0.0 0.0
2011 8335 0.0 0.0 0.0
2012 8362 0.0 0.0 0.0
2013 8481 0.0 0.0 0.0
2014 8560 0.0 0.0 0.0
2015 8187 0.0 0.0 0.0
2016 4835 0.0 0.0 0.0

For data sources see[5]

References