X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454212906002

Well Details

Well ID: 0454212906002
Loading map...
Location: 00/06-29-045-21W4/2
Location Alias: 00/06-29-45-21 W4M
Location Alias 2: 00/06-29-045-21 W4/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 21
Section: 29
County/Municipality: Camrose County
Well Name: CNRL DUHAMEL 6-29MU-45-21
Operator Name: Canadian Natural Resources Limited
License Number: 0004246
License Date: 1952-02-20
License Status: Abandoned
Spud Date: 1952-03-21
Final Drill Date: 1952-05-16
Well Total Depth: 2121.70 m
Surface Hole Latitude: 52.907485
Surface Hole Longitude: -113.018478

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-02-20 Obtained License
1952-04-24 Production Casing Operation Performed
1952-05-02 Drill Stem Test Performed
1952-05-13 Drill Stem Test Performed
1952-05-16 Finished Drilling
1952-05-16 Lost Circulation Occurred
1952-05-16 Well Mode changed to Drilled and Cased
1952-05-21 Perforation Treatment Performed - Bullet Perforation
1952-05-31 Well Began Production
1952-05-31 Well Fluid changed to Crude Oil
1952-05-31 Well Mode changed to Flowing
1975-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-02-27 Well Fluid changed to Crude Oil
1975-02-27 Well Mode changed to Flowing
1975-03-01 Perforation Treatment Performed - Jet Perforation
1975-06-02 Well Fluid changed to Crude Oil
1975-06-02 Well Mode changed to Pumping
1990-09-20 Well Log Performed
1990-09-21 Perforation Treatment Performed - Cement Squeeze
1990-09-22 Perforation Treatment Performed - Jet Perforation
1990-09-22 Well Log Performed
1990-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-05 Well Log Performed
1995-10-07 Well Log Performed
1995-10-08 Perforation Treatment Performed - Jet Perforation
1995-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-10 Well Log Performed
1995-10-11 Perforation Treatment Performed - Jet Perforation
1995-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-10 Perforation Treatment Performed - Jet Perforation
1997-12-11 Well Log Performed
1998-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-26 Plug Back Performed
1998-07-26 Well Fluid changed to Crude Oil
1998-07-26 Well Mode changed to Abandoned Zone
1998-07-27 Perforation Treatment Performed - Jet Perforation
1998-07-27 Well Log Performed
1998-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-28 Perforation Treatment Performed - Jet Perforation
1998-07-28 Plug Back Performed
1998-07-28 Well Log Performed
1998-07-29 Well Log Performed
2010-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-06 Plug Back Performed
2010-06-07 Well Log Performed
2010-06-12 Perforation Treatment Performed - Jet Perforation
2010-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-14 Perforation Treatment Performed - Remedial Casing
2010-06-15 Perforation Treatment Performed - Jet Perforation
2010-06-15 Well Log Performed
2010-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-16 Perforation Treatment Performed - Remedial Casing
2010-06-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-05-21 Bullet Perforation 1370.40 1375.00 20
1995-10-11 Perforation 1350.30 1353.30 13
1995-10-12 Acid Treatment 1350.30 1353.30 0
1997-12-10 Perforation 1350.30 1353.30 17
1997-12-10 Perforation 1347.20 1349.60 17
1998-07-26 Packing Device Capped w/Cement 1324.00 1332.00 0
1998-07-27 Perforation 1231.70 1233.70 17
1998-07-28 Packing Device Capped w/Cement 1220.00 1228.00 0
1998-07-28 Perforation 1205.00 1207.00 17
2010-06-06 Packing Device Capped w/Cement 1190.00 1198.00 0
2010-06-12 Perforation 1042.00 1045.00 13
1952-05-21 Bullet Perforation 1448.70 1460.90 20
2010-06-14 Remedial Casing Cementing 1042.00 1045.00 0
2010-06-14 Packing Device Capped w/Cement 1025.50 1037.00 0
2010-06-15 Perforation 545.00 548.00 13
2010-06-16 Remedial Casing Cementing 545.00 548.00 0
2010-06-16 Packing Device Capped w/Cement 522.00 540.00 0
1975-02-27 Packing Device Capped w/Cement 1380.70 1386.80 0
1975-03-01 Perforation 1367.30 1369.20 0
1990-09-21 Cement Squeeze 1367.30 1375.00 0
1990-09-22 Perforation 1362.50 1364.50 16
1990-09-23 Acid Treatment 1362.50 1364.50 0
1995-10-08 Perforation 1356.40 1360.40 13
1995-10-10 Acid Treatment 1356.40 1360.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 14 0.0 0.0 0.0
1971 10 0.0 0.0 0.0
1972 24 0.0 0.0 0.0
1973 2627 0.0 0.0 0.0
1974 5804 0.0 0.0 0.0
1975 4908 0.0 0.0 0.0
1976 1333 0.0 0.0 0.0
1977 4557 0.0 0.0 0.0
1978 5356 0.0 0.0 0.0
1979 7082 0.0 0.0 0.0
1980 7762 0.0 0.0 0.0
1981 6924 0.0 0.0 0.0
1982 7406 0.0 0.0 0.0
1983 8299 0.0 0.0 0.0
1984 8290 0.0 0.0 0.0
1985 8550 0.0 0.0 0.0
1986 8525 0.0 0.0 0.0
1987 8191 0.0 0.0 0.0
1988 8414 0.0 0.0 0.0
1989 8480 0.0 0.0 0.0
1990 7479 0.0 0.0 0.0
1991 8231 0.0 0.0 0.0
1992 8673 0.0 0.0 0.0
1993 8414 0.0 0.0 0.0
1994 8625 0.0 0.0 0.0
1995 7954 0.0 0.0 0.0
1996 8533 0.0 0.0 0.0
1997 8315 0.0 0.0 0.0
1998 4939 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1952-05-16 Lost Circulation 1437.70 1437.70

For data sources see[6]

References