X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454220102022

Well Details

Well ID: 0454220102022
Loading map...
Location: 02/02-01-045-22W4/2
Location Alias: 02/02-01-45-22 W4M
Location Alias 2: 02/02-01-045-22 W4/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 22
Section: 01
County/Municipality: Camrose County
Well Name: CNRL ET AL MALMO 2A-1-45-22
Operator Name: Canadian Natural Resources Limited
License Number: 0004051
License Date: 1952-01-07
License Status: Abandoned
Spud Date: 1952-01-19
Final Drill Date: 1966-02-10
Well Total Depth: 1489.60 m
Surface Hole Latitude: 52.845272
Surface Hole Longitude: -113.060887

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-01-07 Obtained License
1952-02-11 Drill Stem Test Performed
1952-02-21 Liner Casing Operation Performed
1952-02-25 Perforation Treatment Performed - Bullet Perforation
1952-02-26 Perforation Treatment Performed - Cement Squeeze
1952-02-29 Perforation Treatment Performed - Bullet Perforation
1952-03-01 Perforation Treatment Performed - Cement Squeeze
1952-03-03 Drill Stem Test Performed
1952-03-04 Perforation Treatment Performed - Bullet Perforation
1952-03-05 Perforation Treatment Performed - Cement Squeeze
1952-03-08 Perforation Treatment Performed - Bullet Perforation
1966-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-01-21 Perforation Treatment Performed - Cement Squeeze
1966-02-10 Drill Stem Test Performed
1966-02-10 Finished Drilling
1966-02-10 Perforation Treatment Performed - Open-Hole Completion
1966-02-10 Well Mode changed to Drilled and Cased
1966-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-02-16 Well Began Production
1966-02-16 Well Fluid changed to Crude Oil
1966-02-16 Well Mode changed to Flowing
1966-03-22 Perforation Treatment Performed - Bullet Perforation
1966-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-28 Perforation Treatment Performed - Cement Squeeze
1966-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-04-12 Perforation Treatment Performed - Cement Squeeze
1966-04-14 Perforation Treatment Performed - Open-Hole Completion
1966-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-05 Perforation Treatment Performed - Cement Plug
1967-01-05 Well Fluid changed to Crude Oil
1967-01-05 Well Mode changed to Abandoned Zone
1967-01-06 Perforation Treatment Performed - Jet Perforation
1986-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-05-05 Plug Back Performed
1986-05-07 Perforation Treatment Performed - Jet Perforation
1986-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-28 Well Log Performed
1990-06-08 Well Log Performed
1990-06-09 Perforation Treatment Performed - Jet Perforation
2012-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-03 Plug Back Performed
2012-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-07 Plug Back Performed
2013-12-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-02-25 Bullet Perforation 1285.60 1286.30 13
1966-02-10 Open Hole/Barefoot Completion 1485.90 1488.90 0
1966-02-12 Acid Treatment 1485.90 1488.90 0
1966-03-22 Bullet Perforation 1482.90 1484.40 7
1966-03-23 Acid Treatment 1482.90 1484.40 0
1966-03-28 Cement Squeeze 1482.90 1484.40 0
1966-04-06 Acid Treatment 1485.90 1488.90 0
1966-04-12 Cement Squeeze 1485.90 1488.90 0
1966-04-14 Open Hole/Barefoot Completion 1485.90 1489.60 0
1966-04-19 Acid Treatment 1485.90 1489.60 0
1967-01-05 Cement Plug 1364.60 1488.90 0
1952-02-26 Cement Squeeze 1285.60 1286.30 0
1967-01-06 Perforation 1277.40 1280.50 7
1986-05-05 Packing Device Capped w/Cement 1274.00 1276.50 0
1986-05-07 Perforation 1079.30 1080.80 7
1986-05-12 Acid Treatment 1079.30 1080.80 0
1990-06-09 Perforation 1268.60 1269.80 7
2012-08-03 Packing Device Capped w/Cement 1254.00 1262.00 0
2012-08-07 Packing Device Capped w/Cement 1065.00 1073.00 0
1952-02-29 Bullet Perforation 1284.40 1285.00 13
1952-03-01 Cement Squeeze 1284.40 1285.00 0
1952-03-04 Bullet Perforation 1285.00 1286.00 0
1952-03-05 Cement Squeeze 1285.00 1286.00 0
1952-03-08 Bullet Perforation 1406.70 1409.70 13
1966-01-21 Acid Treatment 1406.70 1409.70 0
1966-01-21 Cement Squeeze 1407.00 1409.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-08 No Incident Encountered 0.00 0.00
2012-08-08 No Incident Encountered 0.00 0.00
2012-08-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References