If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454221815003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.883786,"lon":-113.18296,"icon":""}]} |
Location: 00/15-18-045-22W4/3 | |
Location Alias: 00/15-18-45-22 W4M | |
Location Alias 2: 00/15-18-045-22 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 22 | |
Section: 18 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: CPC RESOURCES NEWNOR 15-18-45-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0310129 | |
License Date: 2004-06-11 | |
License Status: Issued | |
Spud Date: 2004-06-28 | |
Final Drill Date: 2004-07-02 | |
Well Total Depth: 1342.00 m | |
Surface Hole Latitude: 52.883786 | |
Surface Hole Longitude: -113.182960 |
Date | Event |
---|---|
2004-06-11 | Obtained License |
2004-06-28 | Surface Casing Operation Performed |
2004-07-01 | Well Log Performed |
2004-07-02 | Finished Drilling |
2004-07-02 | Production Casing Operation Performed |
2004-07-02 | Rig Released |
2004-07-02 | Well Mode changed to Drilled and Cased |
2004-07-24 | Well Log Performed |
2004-08-18 | Perforation Treatment Performed - Jet Perforation |
2004-09-19 | Perforation Treatment Performed - Jet Perforation |
2004-09-21 | Perforation Treatment Performed - Fractured |
2004-09-29 | Perforation Treatment Performed - Jet Perforation |
2004-09-30 | Perforation Treatment Performed - Fractured |
2004-10-06 | Perforation Treatment Performed - Jet Perforation |
2004-10-08 | Perforation Treatment Performed - Fractured |
2006-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-08 | Plug Back Performed |
2006-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-09 | Plug Back Performed |
2006-03-13 | Perforation Treatment Performed - Jet Perforation |
2006-07-14 | Perforation Treatment Performed - Fractured |
2006-07-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-07-15 | Well Mode changed to Testing |
2008-09-26 | Well Began Production |
2008-09-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-09-26 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-08-18 | Perforation | 1325.50 | 1326.50 | 20 |
2006-03-09 | Packing Device Capped w/Cement | 1194.00 | 1202.00 | 0 |
2006-03-13 | Perforation | 370.00 | 371.00 | 13 |
2006-03-13 | Perforation | 306.30 | 307.30 | 13 |
2006-03-13 | Perforation | 303.30 | 305.50 | 13 |
2006-03-13 | Perforation | 302.00 | 303.00 | 13 |
2006-03-13 | Perforation | 295.50 | 297.50 | 13 |
2006-03-13 | Perforation | 288.90 | 289.90 | 13 |
2006-03-13 | Perforation | 274.50 | 275.50 | 13 |
2006-03-13 | Perforation | 270.00 | 271.00 | 13 |
2006-07-14 | Fracture | 270.00 | 371.00 | 0 |
2004-09-19 | Perforation | 1235.00 | 1239.00 | 20 |
2004-09-21 | Fracture | 1235.00 | 1239.00 | 0 |
2004-09-29 | Perforation | 1228.00 | 1230.00 | 20 |
2004-09-30 | Fracture | 1228.00 | 1230.00 | 0 |
2004-10-06 | Perforation | 1207.00 | 1210.00 | 20 |
2004-10-08 | Fracture | 1207.00 | 1210.00 | 0 |
2006-03-08 | Packing Device Capped w/Cement | 1310.00 | 1318.00 | 0 |
2006-03-08 | Packing Device Capped w/Cement | 1217.00 | 1225.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 120 | 0.0 | 0.0 | 0.0 |
2008 | 2328 | 0.0 | 0.0 | 0.0 |
2009 | 8741 | 0.0 | 0.0 | 0.0 |
2010 | 8711 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8773 | 0.0 | 0.0 | 0.0 |
2013 | 8722 | 0.0 | 0.0 | 0.0 |
2014 | 8745 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8773 | 0.0 | 0.0 | 0.0 |
2017 | 8295 | 0.0 | 0.0 | 0.0 |
2018 | 8591 | 0.0 | 0.0 | 0.0 |
2019 | 2539 | 0.0 | 0.0 | 0.0 |
For data sources see[5]