X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455010213020

Well Details

Well ID: 0455010213020
Loading map...
Location: 02/13-02-045-01W5/0
Location Alias: 02/13-02-45-01 W5M
Location Alias 2: 02/13-02-045-01 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 01
Section: 02
County/Municipality: County of Wetaskiwin No. 10
Well Name: NAL WROSES 13-2-45-1
Operator Name: NAL Resources Limited
License Number: 0437697
License Date: 2011-10-16
License Status: Amended
Spud Date: 2011-11-04
Final Drill Date: 2011-11-25
Well Total Depth: 3364.00 m
Surface Hole Latitude: 52.844195
Surface Hole Longitude: -114.033093

For data sources see[1][2]

Well History

Date Event
2011-10-16 Obtained License
2011-11-06 Surface Casing Operation Performed
2011-11-08 Direction Drilling Operation Performed - Horizontal
2011-11-20 Intermediate Casing Operation Performed
2011-11-25 Finished Drilling
2011-11-25 Well Mode changed to Drilled and Cased
2011-11-28 Liner Casing Operation Performed
2011-11-29 Rig Released
2011-12-04 Well Log Performed
2011-12-06 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-06 Perforation Treatment Performed - Open-Hole Completion
2011-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-23 Well Began Production
2011-12-23 Well Fluid changed to Gas
2011-12-23 Well Mode changed to Flowing
2015-03-01 Well Fluid changed to Gas
2015-03-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-08 1347.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-06 Open Hole/Barefoot Completion 3351.80 3364.00 0
2011-12-07 Multi-Stage Fracture 2489.40 2489.50 0
2011-12-07 Multi-Stage Fracture 2379.80 2379.90 0
2011-12-07 Multi-Stage Fracture 2280.00 2280.10 0
2011-12-07 Multi-Stage Fracture 2064.50 2064.60 0
2011-12-07 Multi-Stage Fracture 1964.00 1964.10 0
2011-12-06 Multi-Stage Fracture 3324.50 3324.60 0
2011-12-06 Multi-Stage Fracture 3227.10 3227.20 0
2011-12-06 Multi-Stage Fracture 3121.10 3121.20 0
2011-12-06 Multi-Stage Fracture 3025.60 3025.70 0
2011-12-06 Multi-Stage Fracture 2914.40 2914.50 0
2011-12-06 Multi-Stage Fracture 2801.50 2801.60 0
2011-12-06 Multi-Stage Fracture 2701.80 2701.90 0
2011-12-07 Multi-Stage Fracture 2602.10 2602.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 204 0.0 0.0 0.0
2012 8497 0.0 0.0 0.0
2013 8703 0.0 0.0 0.0
2014 8527 0.0 0.0 0.0
2015 8277 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8479 0.0 0.0 0.0
2018 8651 0.0 0.0 0.0
2019 8499 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References