X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455013602002

Well Details

Well ID: 0455013602002
Loading map...
Location: 00/02-36-045-01W5/2
Location Alias: 00/02-36-45-01 W5M
Location Alias 2: 00/02-36-045-01 W5/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 01
Section: 36
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 2-36-45-1
Operator Name: Cenovus Energy Inc.
License Number: 0109881
License Date: 1984-10-12
License Status: Issued
Spud Date: 1984-10-13
Final Drill Date: 1984-11-01
Well Total Depth: 2277.00 m
Surface Hole Latitude: 52.917774
Surface Hole Longitude: -114.008456

For data sources see[1][2]

Well History

Date Event
1984-10-12 Obtained License
1984-10-13 Lost Circulation Occurred
1984-10-14 Surface Casing Operation Performed
1984-10-27 Lost Circulation Occurred
1984-10-31 Lost Circulation Occurred
1984-11-01 Finished Drilling
1984-11-01 Well Log Performed
1984-11-01 Well Mode changed to Drilled and Cased
1984-11-03 Production Casing Operation Performed
1984-11-04 Rig Released
1984-11-20 Perforation Treatment Performed - Jet Perforation
1984-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-05 Perforation Treatment Performed - Cement Squeeze
1985-07-07 Perforation Treatment Performed - Jet Perforation
1985-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-14 Perforation Treatment Performed - Cement Squeeze
1990-11-19 Perforation Treatment Performed - Jet Perforation
1990-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-29 Well Log Performed
1994-10-05 Well Log Performed
1994-10-07 Well Log Performed
1994-10-12 Well Log Performed
1995-10-03 Well Log Performed
1995-10-20 Perforation Treatment Performed - Cement Squeeze
1995-10-21 Perforation Treatment Performed - Jet Perforation
1995-10-21 Well Log Performed
1995-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-14 Perforation Treatment Performed - Jet Perforation
1997-05-14 Well Log Performed
1997-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-30 Perforation Treatment Performed - Jet Perforation
1998-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-27 Perforation Treatment Performed - Jet Perforation
1999-03-05 Perforation Treatment Performed - Jet Perforation
2000-05-16 Perforation Treatment Performed - Jet Perforation
2000-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-09-11 Perforation Treatment Performed - Jet Perforation
2001-09-11 Well Log Performed
2001-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-17 Perforation Treatment Performed - Jet Perforation
2002-07-17 Well Log Performed
2002-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-19 Plug Back Performed
2005-09-19 Well Log Performed
2005-09-21 Perforation Treatment Performed - Jet Perforation
2005-09-21 Well Log Performed
2005-09-22 Well Began Production
2005-09-22 Well Fluid changed to Gas
2005-09-22 Well Mode changed to Flowing
2005-09-24 Perforation Treatment Performed - Fractured
2008-02-07 Well Fluid changed to Gas
2008-02-07 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-11-20 Perforation 2249.00 2251.00 13
1995-10-20 Cement Squeeze 2257.00 2258.50 0
1995-10-21 Perforation 2255.00 2257.00 17
1995-10-22 Acid Treatment 2255.00 2257.00 0
1997-05-14 Perforation 2247.50 2249.00 17
1997-05-15 Acid Treatment 2247.50 2249.00 0
1998-07-30 Perforation 2238.00 2239.50 17
1998-07-31 Acid Treatment 2238.00 2239.50 0
1998-09-27 Perforation 2230.50 2232.00 17
1998-09-27 Acid Treatment 2230.50 2232.00 0
1999-03-05 Perforation 2202.00 2205.00 17
1984-11-21 Acid Treatment 2249.00 2251.00 0
1999-03-05 Perforation 2218.00 2221.00 17
2000-05-16 Perforation 2156.00 2159.00 17
2000-05-16 Perforation 2179.00 2182.00 17
2000-05-18 Acid Treatment 2156.00 2182.00 0
2001-09-11 Perforation 2129.50 2133.00 17
2001-09-11 Perforation 2123.00 2127.00 17
2001-09-12 Acid Treatment 2123.00 2127.00 0
2001-09-12 Acid Treatment 2129.50 2133.00 0
2002-07-17 Perforation 2118.50 2121.00 17
2002-07-17 Acid Treatment 2118.50 2121.00 0
1985-07-05 Cement Squeeze 2249.00 2251.00 0
2002-08-08 Acid Treatment 2123.00 2127.00 0
2005-09-19 Packing Device Capped w/Cement 2102.00 2110.00 0
2005-09-21 Perforation 1756.00 1761.00 17
2005-09-24 Fracture 1756.00 1761.00 0
1985-07-07 Perforation 2254.40 2255.40 13
1985-07-08 Acid Treatment 2254.40 2255.40 0
1988-07-14 Acid Treatment 2254.40 2255.40 0
1990-11-14 Cement Squeeze 2254.40 2255.40 0
1990-11-19 Perforation 2257.00 2258.50 13
1990-11-20 Acid Treatment 2257.00 2258.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 711 0.0 0.0 0.0
2006 8706 0.0 0.0 0.0
2007 8004 0.0 0.0 0.0
2008 8399 0.0 0.0 0.0
2009 8399 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 7817 0.0 0.0 0.0
2012 8567 0.0 0.0 0.0
2013 8586 0.0 0.0 0.0
2014 8137 0.0 0.0 0.0
2015 5095 0.0 0.0 0.0
2016 7840 0.0 0.0 0.0
2017 7966 0.0 0.0 0.0
2018 8571 0.0 0.0 0.0
2019 6646 0.0 0.0 0.0
2020 1488 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-10-13 Lost Circulation 56.00 57.00
1984-10-27 Lost Circulation 2210.00 2210.00
1984-10-31 Lost Circulation 2256.00 2277.00