X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455050408000

Well Details

Well ID: 0455050408000
Loading map...
Location: 00/08-04-045-05W5/0
Location Alias: 00/08-04-45-05 W5M
Location Alias 2: 00/08-04-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 04
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 8-4-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0440294
License Date: 2011-12-05
License Status: Issued
Spud Date: 2011-12-20
Final Drill Date: 2012-01-02
Well Total Depth: 3128.00 m
Surface Hole Latitude: 52.849179
Surface Hole Longitude: -114.680097

For data sources see[1][2]

Well History

Date Event
2011-12-05 Obtained License
2011-12-21 Surface Casing Operation Performed
2011-12-29 Direction Drilling Operation Performed - Horizontal
2011-12-30 Well Log Performed
2012-01-02 Finished Drilling
2012-01-02 Well Log Performed
2012-01-02 Well Mode changed to Drilled and Cased
2012-01-03 Production Casing Operation Performed
2012-01-03 Rig Released
2012-02-01 Well Log Performed
2012-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-08 Perforation Treatment Performed - Open-Hole Completion
2012-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-16 Well Began Production
2012-03-16 Well Fluid changed to Crude Oil
2012-03-16 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-29 1404.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-08 Open Hole/Barefoot Completion 3118.00 3128.00 0
2012-02-09 Multi-Stage Fracture 2478.10 2478.20 0
2012-02-09 Multi-Stage Fracture 2405.70 2405.80 0
2012-02-09 Multi-Stage Fracture 2333.30 2333.40 0
2012-02-09 Multi-Stage Fracture 2260.90 2261.00 0
2012-02-09 Multi-Stage Fracture 2188.50 2188.60 0
2012-02-09 Multi-Stage Fracture 2112.40 2112.50 0
2012-02-09 Multi-Stage Fracture 2039.90 2040.00 0
2012-02-09 Multi-Stage Fracture 1967.50 1967.60 0
2012-02-09 Multi-Stage Fracture 1895.00 1985.10 0
2012-02-08 Multi-Stage Fracture 3070.50 3070.60 0
2012-02-08 Multi-Stage Fracture 2998.10 2998.20 0
2012-02-08 Multi-Stage Fracture 2925.70 2925.80 0
2012-02-08 Multi-Stage Fracture 2853.40 2853.50 0
2012-02-08 Multi-Stage Fracture 2781.10 2781.20 0
2012-02-08 Multi-Stage Fracture 2708.70 2708.80 0
2012-02-08 Multi-Stage Fracture 2636.20 2636.30 0
2012-02-08 Multi-Stage Fracture 2550.40 2550.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6683 0.0 0.0 0.0
2013 8145 0.0 0.0 0.0
2014 8319 0.0 0.0 0.0
2015 8065 0.0 0.0 0.0
2016 8445 0.0 0.0 0.0
2017 8488 0.0 0.0 0.0
2018 6058 0.0 0.0 0.0
2019 8629 0.0 0.0 0.0
2020 648 0.0 0.0 0.0

For data sources see[6]

References