X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455050605000

Well Details

Well ID: 0455050605000
Loading map...
Location: 00/05-06-045-05W5/0
Location Alias: 00/05-06-45-05 W5M
Location Alias 2: 00/05-06-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 06
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 5-6-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0436724
License Date: 2011-09-12
License Status: Issued
Spud Date: 2011-11-10
Final Drill Date: 2011-11-18
Well Total Depth: 3114.00 m
Surface Hole Latitude: 52.848083
Surface Hole Longitude: -114.703476

For data sources see[1][2]

Well History

Date Event
2011-09-12 Obtained License
2011-11-10 Lost Circulation Occurred
2011-11-12 Surface Casing Operation Performed
2011-11-14 Direction Drilling Operation Performed - Horizontal
2011-11-18 Finished Drilling
2011-11-18 Well Log Performed
2011-11-18 Well Mode changed to Drilled and Cased
2011-11-19 Production Casing Operation Performed
2011-11-20 Rig Released
2012-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-09 Perforation Treatment Performed - Open-Hole Completion
2012-02-10 Well Began Production
2012-02-10 Well Fluid changed to Crude Oil
2012-02-10 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-14 1380.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-09 Open Hole/Barefoot Completion 3103.70 3114.00 0
2012-01-09 Multi-Stage Fracture 2518.30 2518.50 0
2012-01-09 Multi-Stage Fracture 2449.30 2449.50 0
2012-01-09 Multi-Stage Fracture 2379.70 2379.90 0
2012-01-09 Multi-Stage Fracture 2295.70 2295.90 0
2012-01-09 Multi-Stage Fracture 2239.10 2239.30 0
2012-01-09 Multi-Stage Fracture 2171.50 2171.70 0
2012-01-09 Multi-Stage Fracture 2086.00 2086.20 0
2012-01-09 Multi-Stage Fracture 2002.60 2002.80 0
2012-01-09 Multi-Stage Fracture 1946.40 1946.60 0
2012-01-09 Multi-Stage Fracture 3055.80 3056.00 0
2012-01-09 Multi-Stage Fracture 3001.00 3001.20 0
2012-01-09 Multi-Stage Fracture 2929.90 2930.10 0
2012-01-09 Multi-Stage Fracture 2848.50 2848.70 0
2012-01-09 Multi-Stage Fracture 2796.70 2796.90 0
2012-01-09 Multi-Stage Fracture 2699.90 2700.10 0
2012-01-09 Multi-Stage Fracture 2643.40 2643.60 0
2012-01-09 Multi-Stage Fracture 2560.10 2560.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7367 0.0 0.0 0.0
2013 8135 0.0 0.0 0.0
2014 8474 0.0 0.0 0.0
2015 8276 0.0 0.0 0.0
2016 7766 0.0 0.0 0.0
2017 7616 0.0 0.0 0.0
2018 6481 0.0 0.0 0.0
2019 3916 0.0 0.0 0.0
2020 1315 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-11-10 Lost Circulation 51.00 600.00

For data sources see[7]

References