X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455051214000

Well Details

Well ID: 0455051214000
Loading map...
Location: 00/14-12-045-05W5/0
Location Alias: 00/14-12-45-05 W5M
Location Alias 2: 00/14-12-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 12
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 14-12-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0436160
License Date: 2011-08-18
License Status: Suspension
Spud Date: 2011-09-27
Final Drill Date: 2011-10-03
Well Total Depth: 3114.00 m
Surface Hole Latitude: 52.859186
Surface Hole Longitude: -114.591086

For data sources see[1][2]

Well History

Date Event
2011-08-18 Obtained License
2011-09-28 Surface Casing Operation Performed
2011-09-29 Direction Drilling Operation Performed - Horizontal
2011-10-03 Finished Drilling
2011-10-03 Well Mode changed to Drilled and Cased
2011-10-05 Production Casing Operation Performed
2011-10-06 Rig Released
2011-10-20 Well Log Performed
2011-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-28 Perforation Treatment Performed - Open-Hole Completion
2011-10-30 Well Log Performed
2011-12-19 Well Began Production
2011-12-19 Well Fluid changed to Crude Oil
2011-12-19 Well Mode changed to Pumping
2013-11-01 Well Fluid changed to Crude Oil
2013-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-29 1300.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-28 Open Hole/Barefoot Completion 3105.10 3114.00 0
2011-10-28 Multi-Stage Fracture 2483.60 2483.90 0
2011-10-28 Multi-Stage Fracture 2390.70 2391.00 0
2011-10-28 Multi-Stage Fracture 2336.50 2336.80 0
2011-10-28 Multi-Stage Fracture 2269.40 2269.70 0
2011-10-28 Multi-Stage Fracture 2189.40 2189.70 0
2011-10-28 Multi-Stage Fracture 2109.40 2109.70 0
2011-10-28 Multi-Stage Fracture 2055.10 2055.40 0
2011-10-28 Multi-Stage Fracture 1975.10 1975.40 0
2011-10-28 Multi-Stage Fracture 1895.80 1896.10 0
2011-10-28 Multi-Stage Fracture 3073.30 3073.60 0
2011-10-28 Multi-Stage Fracture 2992.30 2992.60 0
2011-10-28 Multi-Stage Fracture 2899.30 2899.60 0
2011-10-28 Multi-Stage Fracture 2819.30 2819.60 0
2011-10-28 Multi-Stage Fracture 2765.00 2765.30 0
2011-10-28 Multi-Stage Fracture 2685.00 2685.30 0
2011-10-28 Multi-Stage Fracture 2630.80 2631.10 0
2011-10-28 Multi-Stage Fracture 2550.70 2551.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 480 0.0 0.0 0.0
2012 2573 0.0 0.0 0.0
2013 2327 0.0 0.0 0.0

For data sources see[6]

References