X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455051909000

Well Details

Well ID: 0455051909000
Loading map...
Location: 00/09-19-045-05W5/0
Location Alias: 00/09-19-45-05 W5M
Location Alias 2: 00/09-19-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 19
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 9-19-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0427248
License Date: 2010-12-08
License Status: Suspension
Spud Date: 2011-02-07
Final Drill Date: 2011-02-19
Well Total Depth: 3001.00 m
Surface Hole Latitude: 52.896817
Surface Hole Longitude: -114.728217

For data sources see[1][2]

Well History

Date Event
2010-12-08 Obtained License
2011-02-08 Lost Circulation Occurred
2011-02-10 Surface Casing Operation Performed
2011-02-11 Well Log Performed
2011-02-12 Direction Drilling Operation Performed - Horizontal
2011-02-19 Finished Drilling
2011-02-19 Well Mode changed to Drilled and Cased
2011-02-22 Production Casing Operation Performed
2011-02-22 Rig Released
2011-02-28 Well Log Performed
2011-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-02 Perforation Treatment Performed - Open-Hole Completion
2011-04-01 Well Began Production
2011-04-01 Well Fluid changed to Crude Oil
2011-04-01 Well Mode changed to Pumping
2019-02-01 Well Fluid changed to Crude Oil
2019-02-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-12 1248.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-02 Open Hole/Barefoot Completion 3000.80 3001.00 0
2011-03-02 Multi-Stage Fracture 2474.50 2474.60 0
2011-03-02 Multi-Stage Fracture 2414.20 2414.30 0
2011-03-02 Multi-Stage Fracture 2338.90 2339.00 0
2011-03-02 Multi-Stage Fracture 2291.30 2291.40 0
2011-03-02 Multi-Stage Fracture 2216.70 2216.80 0
2011-03-02 Multi-Stage Fracture 2155.00 2155.10 0
2011-03-02 Multi-Stage Fracture 2093.20 2093.30 0
2011-03-02 Multi-Stage Fracture 2031.70 2031.80 0
2011-03-02 Multi-Stage Fracture 1971.20 1971.30 0
2011-03-02 Multi-Stage Fracture 1909.80 1909.90 0
2011-03-02 Multi-Stage Fracture 2951.90 2952.00 0
2011-03-02 Multi-Stage Fracture 1835.00 1835.10 0
2011-03-02 Multi-Stage Fracture 1787.80 1787.90 0
2011-03-02 Multi-Stage Fracture 2903.70 2903.80 0
2011-03-02 Multi-Stage Fracture 2841.80 2841.90 0
2011-03-02 Multi-Stage Fracture 2767.00 2767.10 0
2011-03-02 Multi-Stage Fracture 2706.40 2706.50 0
2011-03-02 Multi-Stage Fracture 2659.20 2659.30 0
2011-03-02 Multi-Stage Fracture 2598.20 2598.30 0
2011-03-02 Multi-Stage Fracture 2536.40 2536.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6226 0.0 0.0 0.0
2012 8242 0.0 0.0 0.0
2013 8133 0.0 0.0 0.0
2014 8455 0.0 0.0 0.0
2015 6144 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-02-08 Lost Circulation 99.00 204.00

For data sources see[7]

References