X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455052204020

Well Details

Well ID: 0455052204020
Loading map...
Location: 02/04-22-045-05W5/0
Location Alias: 02/04-22-45-05 W5M
Location Alias 2: 02/04-22-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 22
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 4-22-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0425306
License Date: 2010-10-29
License Status: Issued
Spud Date: 2010-12-10
Final Drill Date: 2011-01-04
Well Total Depth: 3010.00 m
Surface Hole Latitude: 52.888527
Surface Hole Longitude: -114.631758

For data sources see[1][2]

Well History

Date Event
2010-10-29 Obtained License
2010-12-13 Surface Casing Operation Performed
2010-12-30 Direction Drilling Operation Performed - Horizontal
2011-01-04 Finished Drilling
2011-01-04 Well Mode changed to Drilled and Cased
2011-01-06 Production Casing Operation Performed
2011-01-07 Rig Released
2011-01-18 Well Log Performed
2011-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-24 Perforation Treatment Performed - Open-Hole Completion
2011-02-03 Well Log Performed
2011-03-09 Well Began Production
2011-03-09 Well Fluid changed to Crude Oil
2011-03-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-30 1328.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-24 Open Hole/Barefoot Completion 3000.00 3010.00 0
2011-01-24 Multi-Stage Fracture 2499.10 2499.20 0
2011-01-24 Multi-Stage Fracture 2430.00 2430.10 0
2011-01-24 Multi-Stage Fracture 2371.70 2371.80 0
2011-01-24 Multi-Stage Fracture 2312.00 2312.10 0
2011-01-24 Multi-Stage Fracture 2253.00 2253.10 0
2011-01-24 Multi-Stage Fracture 2194.00 2194.10 0
2011-01-24 Multi-Stage Fracture 2135.30 2135.40 0
2011-01-24 Multi-Stage Fracture 2076.00 2076.10 0
2011-01-24 Multi-Stage Fracture 2016.00 2016.10 0
2011-01-24 Multi-Stage Fracture 1961.70 1961.80 0
2011-01-24 Multi-Stage Fracture 2966.20 2966.30 0
2011-01-24 Multi-Stage Fracture 1889.30 1889.40 0
2011-01-24 Multi-Stage Fracture 1830.00 1830.10 0
2011-01-24 Multi-Stage Fracture 2908.00 2908.10 0
2011-01-24 Multi-Stage Fracture 2850.50 2850.60 0
2011-01-24 Multi-Stage Fracture 2792.50 2792.60 0
2011-01-24 Multi-Stage Fracture 2733.90 2734.00 0
2011-01-24 Multi-Stage Fracture 2675.40 2675.50 0
2011-01-24 Multi-Stage Fracture 2616.30 2616.40 0
2011-01-24 Multi-Stage Fracture 2556.90 2557.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6696 0.0 0.0 0.0
2012 8771 0.0 0.0 0.0
2013 8446 0.0 0.0 0.0
2014 8516 0.0 0.0 0.0
2015 7134 0.0 0.0 0.0
2016 7842 0.0 0.0 0.0
2017 8474 0.0 0.0 0.0
2018 8570 0.0 0.0 0.0
2019 8583 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References