X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455060302000

Well Details

Well ID: 0455060302000
Loading map...
Location: 00/02-03-045-06W5/0
Location Alias: 00/02-03-45-06 W5M
Location Alias 2: 00/02-03-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 03
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC HZ MINHIK 2-3-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0476114
License Date: 2015-07-13
License Status: Issued
Spud Date: 2015-07-21
Final Drill Date: 2015-07-31
Well Total Depth: 4387.00 m
Surface Hole Latitude: 52.849975
Surface Hole Longitude: -114.749882

For data sources see[1][2]

Well History

Date Event
2015-07-13 Obtained License
2015-07-22 Surface Casing Operation Performed
2015-07-23 Direction Drilling Operation Performed - Deviate
2015-07-24 Direction Drilling Operation Performed - Horizontal
2015-07-29 Well Log Performed
2015-07-31 Finished Drilling
2015-07-31 Production Casing Operation Performed
2015-07-31 Rig Released
2015-07-31 Well Mode changed to Drilled and Cased
2015-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-15 Well Began Production
2015-09-15 Well Fluid changed to Crude Oil
2015-09-15 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-21 Excalibur Drilling Ltd. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-23 1393.60 Deviate (5 - 79 degrees)
2015-07-24 1845.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-03 Multi-Stage Fracture 4371.40 4372.50 0
2015-09-03 Multi-Stage Fracture 3773.70 3775.60 0
2015-09-03 Multi-Stage Fracture 3703.70 3705.60 0
2015-09-03 Multi-Stage Fracture 3622.10 3623.90 0
2015-09-04 Multi-Stage Fracture 3552.50 3554.40 0
2015-09-04 Multi-Stage Fracture 3484.00 3485.90 0
2015-09-04 Multi-Stage Fracture 3415.50 3417.30 0
2015-09-04 Multi-Stage Fracture 3350.00 3351.90 0
2015-09-04 Multi-Stage Fracture 3270.20 3272.10 0
2015-09-04 Multi-Stage Fracture 3204.10 3206.00 0
2015-09-04 Multi-Stage Fracture 3136.10 3138.00 0
2015-09-03 Multi-Stage Fracture 4353.60 4355.50 0
2015-09-04 Multi-Stage Fracture 3057.60 3059.50 0
2015-09-04 Multi-Stage Fracture 2990.40 2992.20 0
2015-09-04 Multi-Stage Fracture 2924.10 2926.00 0
2015-09-04 Multi-Stage Fracture 2856.80 2858.60 0
2015-09-04 Multi-Stage Fracture 2776.40 2778.30 0
2015-09-04 Multi-Stage Fracture 2708.50 2710.30 0
2015-09-04 Multi-Stage Fracture 2629.00 2630.90 0
2015-09-04 Multi-Stage Fracture 2561.70 2563.50 0
2015-09-04 Multi-Stage Fracture 2481.50 2483.30 0
2015-09-04 Multi-Stage Fracture 2415.10 2416.90 0
2015-09-03 Multi-Stage Fracture 4284.00 4285.90 0
2015-09-04 Multi-Stage Fracture 2348.20 2350.10 0
2015-09-04 Multi-Stage Fracture 2269.50 2271.40 0
2015-09-04 Multi-Stage Fracture 2202.20 2204.50 0
2015-09-04 Multi-Stage Fracture 2121.70 2123.50 0
2015-09-03 Multi-Stage Fracture 4214.90 4216.80 0
2015-09-03 Multi-Stage Fracture 4133.60 4135.50 0
2015-09-03 Multi-Stage Fracture 4064.50 4066.30 0
2015-09-03 Multi-Stage Fracture 3995.20 3997.10 0
2015-09-03 Multi-Stage Fracture 3925.80 3927.70 0
2015-09-03 Multi-Stage Fracture 3843.50 3845.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-03 2015-09-04 1,701 3,192 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 81.8548 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 14.0107 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 3.8159 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0102 N/A
dibromoacetonitrile 3252-43-5 100 0.0102 N/A
non-hazardous ingredients Not Available 100 0.0102 N/A
polyethylene glycol 25322-68-3 100 0.0102 N/A
sodium bromide 7647-15-6 100 0.0102 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.18 N/A
non-hazardous ingredients Not Available 100 0.18 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0417 N/A
propylene glycol 57-55-6 100 0.0417 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0863 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.0863 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0863 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-10 2015-08-23 Groundwater - Non-saline less than or equal to 150m deep 1387
2015-08-14 2015-08-25 Groundwater - Non-saline less than or equal to 150m deep 2429

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2240 0.0 0.0 0.0
2016 8597 0.0 0.0 0.0
2017 8457 0.0 0.0 0.0
2018 8636 0.0 0.0 0.0
2019 8616 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-31 No Incident Encountered 0.00 0.00
2015-09-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References