X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455061008000

Well Details

Well ID: 0455061008000
Loading map...
Location: 00/08-10-045-06W5/0
Location Alias: 00/08-10-45-06 W5M
Location Alias 2: 00/08-10-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 10
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 8-10-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0444395
License Date: 2012-02-23
License Status: Issued
Spud Date: 2012-06-29
Final Drill Date: 2012-07-06
Well Total Depth: 3017.00 m
Surface Hole Latitude: 52.863809
Surface Hole Longitude: -114.797378

For data sources see[1][2]

Well History

Date Event
2012-02-23 Obtained License
2012-06-29 Lost Circulation Occurred
2012-07-01 Surface Casing Operation Performed
2012-07-02 Direction Drilling Operation Performed - Deviate
2012-07-04 Direction Drilling Operation Performed - Horizontal
2012-07-04 Well Log Performed
2012-07-06 Finished Drilling
2012-07-06 Well Log Performed
2012-07-06 Well Mode changed to Drilled and Cased
2012-07-07 Production Casing Operation Performed
2012-07-07 Rig Released
2012-09-23 Well Log Performed
2012-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-02 Perforation Treatment Performed - Open-Hole Completion
2012-11-15 Well Began Production
2012-11-15 Well Fluid changed to Crude Oil
2012-11-15 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-07-02 673.00 Deviate (5 - 79 degrees)
2012-07-04 1826.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-02 Open Hole/Barefoot Completion 3006.20 3017.00 0
2012-10-02 Multi-Stage Fracture 2442.40 2442.50 0
2012-10-02 Multi-Stage Fracture 2385.90 2386.00 0
2012-10-02 Multi-Stage Fracture 2329.50 2329.60 0
2012-10-02 Multi-Stage Fracture 2259.50 2259.60 0
2012-10-02 Multi-Stage Fracture 2189.50 2189.60 0
2012-10-02 Multi-Stage Fracture 2133.00 2133.10 0
2012-10-02 Multi-Stage Fracture 2049.50 2049.60 0
2012-10-02 Multi-Stage Fracture 1993.10 1993.20 0
2012-10-02 Multi-Stage Fracture 1923.10 1923.20 0
2012-10-02 Multi-Stage Fracture 2974.50 2974.60 0
2012-10-02 Multi-Stage Fracture 2904.70 2904.80 0
2012-10-02 Multi-Stage Fracture 2834.80 2834.90 0
2012-10-02 Multi-Stage Fracture 2778.60 2778.70 0
2012-10-02 Multi-Stage Fracture 2708.60 2708.70 0
2012-10-02 Multi-Stage Fracture 2672.90 2673.00 0
2012-10-02 Multi-Stage Fracture 2582.30 2582.40 0
2012-10-02 Multi-Stage Fracture 2512.40 2512.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1064 0.0 0.0 0.0
2013 8239 0.0 0.0 0.0
2014 8492 0.0 0.0 0.0
2015 8404 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8591 0.0 0.0 0.0
2018 7703 0.0 0.0 0.0
2019 7863 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-29 Lost Circulation 53.00 53.00
2012-10-19 No Incident Encountered 0.00 0.00

For data sources see[7]

References