X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455063414000

Well Details

Well ID: 0455063414000
Loading map...
Location: 00/14-34-045-06W5/0
Location Alias: 00/14-34-45-06 W5M
Location Alias 2: 00/14-34-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 34
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 14-34-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0091128
License Date: 1981-07-09
License Status: Suspension
Spud Date: 1981-08-05
Final Drill Date: 1981-08-16
Well Total Depth: 1610.00 m
Surface Hole Latitude: 52.928040
Surface Hole Longitude: -114.792740

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-07-09 Obtained License
1981-08-16 Finished Drilling
1981-08-16 Well Mode changed to Drilled and Cased
1981-08-18 Production Casing Operation Performed
1982-01-18 Perforation Treatment Performed - Fractured
1982-01-18 Perforation Treatment Performed - Jet Perforation
1982-02-01 Well Began Production
1982-02-01 Well Fluid changed to Crude Oil
1982-02-01 Well Mode changed to Flowing
1982-06-04 Perforation Treatment Performed - Jet Perforation
1982-06-06 Perforation Treatment Performed - Cement Squeeze
1982-06-09 Perforation Treatment Performed - Jet Perforation
1982-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-15 Perforation Treatment Performed - Fractured
1982-07-15 Perforation Treatment Performed - Cement Squeeze
1982-07-19 Perforation Treatment Performed - Jet Perforation
1982-07-21 Perforation Treatment Performed - Fractured
1982-07-28 Perforation Treatment Performed - Cement Squeeze
2001-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-07 Perforation Treatment Performed - Jet Perforation
2001-08-07 Plug Back Performed
2001-08-07 Well Fluid changed to Crude Oil
2001-08-07 Well Log Performed
2001-08-07 Well Mode changed to Abandoned Zone
2011-04-04 Perforation Treatment Performed - Jet Perforation
2011-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-17 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-01-18 Perforation 1575.60 1578.50 7
1982-07-15 Cement Squeeze 1241.00 1250.00 0
1982-07-19 Perforation 1218.00 1221.50 7
1982-07-21 Fracture 1218.00 1221.50 0
1982-07-28 Cement Squeeze 1218.00 1221.50 0
2001-08-07 Packing Device Capped w/Cement 1556.70 1564.70 0
2001-08-07 Perforation 1240.00 1245.00 17
2001-08-07 Perforation 1248.00 1250.00 17
2011-04-04 Perforation 1240.10 1244.90 2
2011-12-17 Packing Device Capped w/Cement 1225.00 1233.00 0
1982-01-18 Fracture 1575.60 1578.50 0
1982-01-18 Fracture 1575.60 1578.50 0
1982-06-04 Perforation 1253.00 1255.00 13
1982-06-06 Cement Squeeze 1253.00 1255.00 0
1982-06-09 Perforation 1241.00 1245.00 7
1982-06-09 Perforation 1248.50 1250.00 7
1982-06-12 Acid Treatment 1241.00 1250.00 0
1982-06-15 Fracture 1241.00 1250.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2920 0.0 0.0 0.0
1983 3236 0.0 0.0 0.0
1984 4488 0.0 0.0 0.0
1985 3476 0.0 0.0 0.0
1986 3320 0.0 0.0 0.0
1987 8747 0.0 0.0 0.0
1988 8303 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 8759 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8712 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8711 0.0 0.0 0.0
1997 8443 0.0 0.0 0.0
1998 4008 0.0 0.0 0.0

For data sources see[5]

References