X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455120103000

Well Details

Well ID: 0455120103000
Loading map...
Location: 00/03-01-045-12W5/0
Location Alias: 00/03-01-45-12 W5M
Location Alias 2: 00/03-01-045-12 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 12
Section: 01
County/Municipality: Yellowhead County
Well Name: WESTBRICK HZ BRAZR 3-1-45-12
Operator Name: Westbrick Energy Ltd.
License Number: 0480522
License Date: 2016-09-28
License Status: Amended
Spud Date: 2016-11-21
Final Drill Date: 2016-12-03
Well Total Depth: 5120.00 m
Surface Hole Latitude: 52.866927
Surface Hole Longitude: -115.599768

For data sources see[1][2]

Well History

Date Event
2016-09-28 Obtained License
2016-11-22 Direction Drilling Operation Performed - Deviate
2016-11-22 Surface Casing Operation Performed
2016-11-27 Well Log Performed
2016-11-28 Direction Drilling Operation Performed - Horizontal
2016-11-28 Intermediate Casing Operation Performed
2016-11-28 Lost Circulation Occurred
2016-12-03 Finished Drilling
2016-12-03 Well Log Performed
2016-12-03 Well Mode changed to Drilled and Cased
2016-12-05 Well Log Performed
2016-12-06 Liner Casing Operation Performed
2016-12-07 Rig Released
2017-01-16 Perforation Treatment Performed - Open-Hole Completion
2017-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-22 Well Began Production
2017-03-22 Well Fluid changed to Gas
2017-03-22 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-11-21 Nabors Drilling Limited 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-11-22 235.60 Deviate (5 - 79 degrees)
2016-11-28 2770.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-16 Open Hole/Barefoot Completion 5112.00 5120.00 0
2017-02-18 Multi-Stage Fracture 4294.60 4295.40 0
2017-02-18 Multi-Stage Fracture 4205.90 4206.70 0
2017-02-18 Multi-Stage Fracture 4104.70 4105.60 0
2017-02-18 Multi-Stage Fracture 4016.10 4016.90 0
2017-02-18 Multi-Stage Fracture 3914.90 3915.80 0
2017-02-18 Multi-Stage Fracture 3814.00 3814.90 0
2017-02-18 Multi-Stage Fracture 3725.60 3726.50 0
2017-02-18 Multi-Stage Fracture 3624.70 3625.60 0
2017-02-18 Multi-Stage Fracture 3523.50 3524.30 0
2017-02-18 Multi-Stage Fracture 3435.00 3435.80 0
2017-02-17 Multi-Stage Fracture 5069.00 5069.10 0
2017-02-18 Multi-Stage Fracture 3334.00 3334.90 0
2017-02-18 Multi-Stage Fracture 3234.00 3234.80 0
2017-02-18 Multi-Stage Fracture 3145.90 3146.70 0
2017-02-19 Multi-Stage Fracture 3045.30 3046.10 0
2017-02-19 Multi-Stage Fracture 2943.90 2944.70 0
2017-02-19 Multi-Stage Fracture 2855.10 2855.90 0
2017-02-17 Multi-Stage Fracture 4971.60 4972.50 0
2017-02-17 Multi-Stage Fracture 4875.70 4876.50 0
2017-02-17 Multi-Stage Fracture 4786.10 4786.90 0
2017-02-17 Multi-Stage Fracture 4686.00 4686.80 0
2017-02-17 Multi-Stage Fracture 4585.20 4586.10 0
2017-02-18 Multi-Stage Fracture 4496.50 4497.30 0
2017-02-18 Multi-Stage Fracture 4395.70 4396.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-17 2017-02-19 2,632 5,987 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 85.7379 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 3.2494 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 8.7887 N/A
SBExcel 20/40 Trican silica crystalline 14808-60-7 100 1.8975 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.01 N/A
2-mercaptoethanol 60-24-2 100 0.01 N/A
dibromoacetonitrile 3252-43-5 100 0.0101 N/A
non-hazardous ingredients Not Available 100 0.01 N/A
sodium bromide 7647-15-6 100 0.01 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0084 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1603 N/A
non-hazardous ingredients Not Available 100 0.1603 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0432 N/A
propylene glycol 57-55-6 100 0.0432 N/A
FR-18 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0873 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0873 N/A
non-hazardous ingredients Not Available 100 0.0873 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.0168 N/A
non-hazardous ingredients Not Available 100 0.0168 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-21 2017-02-22 Surface Water - Lake 5987

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5952 0.0 0.0 0.0
2018 4751 0.0 0.0 0.0
2019 5759 0.0 0.0 0.0
2020 1920 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-11-28 Lost Circulation 2794.00 2794.00
2017-03-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References