X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455121415000

Well Details

Well ID: 0455121415000
Loading map...
Location: 00/15-14-045-12W5/0
Location Alias: 00/15-14-45-12 W5M
Location Alias 2: 00/15-14-045-12 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 12
Section: 14
County/Municipality: Yellowhead County
Well Name: WESTBRICK HZ PEMBINA 15-14-45-12
Operator Name: Westbrick Energy Ltd.
License Number: 0477364
License Date: 2015-10-26
License Status: Issued
Spud Date: 2015-11-24
Final Drill Date: 2015-12-11
Well Total Depth: 4904.00 m
Surface Hole Latitude: 52.864985
Surface Hole Longitude: -115.628683

For data sources see[1][2]

Well History

Date Event
2015-10-26 Obtained License
2015-11-25 Surface Casing Operation Performed
2015-11-29 Intermediate Casing Operation Performed
2015-12-01 Direction Drilling Operation Performed - Deviate
2015-12-05 Direction Drilling Operation Performed - Horizontal
2015-12-11 Finished Drilling
2015-12-11 Well Log Performed
2015-12-11 Well Mode changed to Drilled and Cased
2015-12-12 Liner Casing Operation Performed
2015-12-13 Rig Released
2015-12-18 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-01 Well Began Production
2016-09-01 Well Fluid changed to Gas
2016-09-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-11-24 Trinidad Drilling Ltd. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-12-01 2388.80 Deviate (5 - 79 degrees)
2015-12-05 2830.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-12-18 Multi-Stage Fracture 4890.70 4891.00 0
2015-12-18 Multi-Stage Fracture 4300.40 4300.70 0
2015-12-18 Multi-Stage Fracture 4228.20 4228.50 0
2015-12-18 Multi-Stage Fracture 4157.00 4157.30 0
2015-12-18 Multi-Stage Fracture 4078.30 4078.60 0
2015-12-18 Multi-Stage Fracture 4006.40 4006.70 0
2015-12-18 Multi-Stage Fracture 3934.50 3934.80 0
2015-12-18 Multi-Stage Fracture 3850.80 3851.10 0
2015-12-18 Multi-Stage Fracture 3778.60 3778.90 0
2015-12-18 Multi-Stage Fracture 3706.60 3706.90 0
2015-12-18 Multi-Stage Fracture 3635.10 3635.40 0
2015-12-18 Multi-Stage Fracture 4847.80 4848.10 0
2015-12-18 Multi-Stage Fracture 3562.80 3563.10 0
2015-12-18 Multi-Stage Fracture 3490.40 3490.70 0
2015-12-18 Multi-Stage Fracture 3406.10 3406.40 0
2015-12-18 Multi-Stage Fracture 3333.70 3334.00 0
2015-12-19 Multi-Stage Fracture 3262.00 3262.30 0
2015-12-19 Multi-Stage Fracture 3190.30 3190.60 0
2015-12-19 Multi-Stage Fracture 3118.70 3119.00 0
2015-12-19 Multi-Stage Fracture 3047.20 3047.50 0
2015-12-19 Multi-Stage Fracture 2963.80 2964.10 0
2015-12-19 Multi-Stage Fracture 2904.20 2904.50 0
2015-12-18 Multi-Stage Fracture 4740.60 4740.90 0
2015-12-19 Multi-Stage Fracture 2844.60 2844.90 0
2015-12-19 Multi-Stage Fracture 2784.90 2785.20 0
2015-12-18 Multi-Stage Fracture 4669.50 4669.80 0
2015-12-18 Multi-Stage Fracture 4610.00 4610.30 0
2015-12-18 Multi-Stage Fracture 4550.40 4550.70 0
2015-12-18 Multi-Stage Fracture 4490.90 4491.20 0
2015-12-18 Multi-Stage Fracture 4419.10 4419.40 0
2015-12-18 Multi-Stage Fracture 4359.20 4359.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-12-18 2015-12-19 2,663 8,723 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.4462 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 7.0678 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 8.5392 N/A
SBExcel 20/40 Trican silica crystalline 14808-60-7 100 1.5158 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0102 N/A
dibromoacetonitrile 3252-43-5 100 0.0102 N/A
non-hazardous ingredients Not Available 100 0.0102 N/A
polyethylene glycol 25322-68-3 100 0.0102 N/A
sodium bromide 7647-15-6 100 0.0102 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0164 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1541 N/A
non-hazardous ingredients Not Available 100 0.1541 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0838 N/A
propylene glycol 57-55-6 100 0.0838 N/A
FR-18 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0846 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0846 N/A
non-hazardous ingredients Not Available 100 0.0846 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.0814 N/A
non-hazardous ingredients Not Available 100 0.0814 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-12-11 2015-12-19 Surface Water - Lake 4491
2015-12-11 2015-12-15 Surface Water - Lake 5500
2015-12-19 2015-12-19 Municipal Water 424

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2760 0.0 0.0 0.0
2017 7031 0.0 0.0 0.0
2018 4847 0.0 0.0 0.0
2019 4895 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-12-13 No Incident Encountered 0.00 0.00
2015-12-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References