X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455123116000

Well Details

Well ID: 0455123116000
Loading map...
Location: 00/16-31-045-12W5/0
Location Alias: 00/16-31-45-12 W5M
Location Alias 2: 00/16-31-045-12 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 12
Section: 31
County/Municipality: Yellowhead County
Well Name: DOME ET AL BRAZEAU RIVER 16-31-45-12
Operator Name: BP Canada Energy Group ULC
License Number: 0106726
License Date: 1984-04-11
License Status: RecCertified
Spud Date: 1984-08-23
Final Drill Date: 1984-09-09
Well Total Depth: 2580.00 m
Surface Hole Latitude: 52.928184
Surface Hole Longitude: -115.723848

For data sources see[1][2]

Well History

Date Event
1984-04-11 Obtained License
1984-08-24 Surface Casing Operation Performed
1984-09-09 Finished Drilling
1984-09-10 Well Log Performed
1984-09-12 Production Casing Operation Performed
1984-09-12 Rig Released
1984-10-21 Well Log Performed
1984-10-22 Perforation Treatment Performed - Jet Perforation
1984-10-22 Well Log Performed
1984-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-25 Perforation Treatment Performed - Cement Squeeze
1984-10-27 Perforation Treatment Performed - Jet Perforation
1984-10-27 Well Log Performed
1984-10-29 Perforation Treatment Performed - Fractured
1984-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-12-15 Plug Back Performed
1984-12-15 Well Log Performed
1984-12-18 Perforation Treatment Performed - Jet Perforation
1984-12-18 Well Log Performed
1984-12-19 Perforation Treatment Performed - Fractured
1984-12-22 Well Log Performed
1984-12-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-12-29 Plug Back Performed
1984-12-29 Well Log Performed
1984-12-30 Perforation Treatment Performed - Jet Perforation
1985-01-02 Perforation Treatment Performed - Fractured
1985-01-04 Well Log Performed
1985-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-01-06 Plug Back Performed
1985-01-06 Well Mode changed to Abandoned
1985-01-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-10-22 Perforation 2558.00 2559.00 8
1984-12-30 Perforation 1770.50 1772.00 13
1985-01-02 Fracture 1770.50 1772.00 0
1985-01-06 Packing Device Capped w/Cement 1746.00 1754.00 0
1984-10-23 Acid Treatment 2558.00 2559.00 0
1984-10-25 Cement Squeeze 2558.00 2559.00 0
1984-10-27 Perforation 2548.00 2551.00 7
1984-10-29 Fracture 2548.00 2551.00 0
1984-12-15 Packing Device Capped w/Cement 2527.00 2535.00 0
1984-12-18 Perforation 2179.00 2182.50 13
1984-12-19 Fracture 2179.00 2182.50 0
1984-12-29 Packing Device Capped w/Cement 2158.00 2166.00 0

For data sources see[4]



References