X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455141710007

Well Details

Well ID: 0455141710007
Loading map...
Location: 00/10-17-045-14W5/7
Location Alias: 00/10-17-45-14 W5M
Location Alias 2: 00/10-17-045-14 W5/07
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 14
Section: 17
County/Municipality: Yellowhead County
Well Name: FAIRBORNE BRAZR 10-17-45-14
Operator Name: Tourmaline Oil Corp.
License Number: 0149048
License Date: 1991-06-03
License Status: Suspension
Spud Date: 1991-07-21
Final Drill Date: 1991-10-10
Well Total Depth: 3977.00 m
Surface Hole Latitude: 52.881325
Surface Hole Longitude: -115.994194

For data sources see[1][2]

Well History

Date Event
1991-06-03 Obtained License
1991-07-25 Surface Casing Operation Performed
1991-08-19 Well Log Performed
1991-08-22 Lost Circulation Occurred
1991-08-29 Intermediate Casing Operation Performed
1991-09-14 Direction Drilling Operation Performed - Deviate
1991-09-16 Kick Occurred
1991-09-30 Well Log Performed
1991-10-03 Production Casing Operation Performed
1991-10-10 Finished Drilling
1991-10-10 Well Log Performed
1991-10-10 Well Mode changed to Drilled and Cased
1991-10-11 Plug Back Performed
1991-10-11 Well Log Performed
1991-10-13 Rig Released
1995-12-19 Well Log Performed
1995-12-20 Well Log Performed
1995-12-22 Perforation Treatment Performed - Jet Perforation
1996-01-03 Perforation Treatment Performed - Fractured
1996-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-30 Plug Back Performed
1996-01-30 Well Log Performed
1996-02-02 Perforation Treatment Performed - Jet Perforation
1996-02-02 Well Log Performed
1996-02-04 Perforation Treatment Performed - Fractured
1996-02-06 Well Log Performed
1996-02-07 Perforation Treatment Performed - Fractured
1996-02-10 Well Log Performed
1996-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-15 Plug Back Performed
1999-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-24 Plug Back Performed
1999-09-24 Well Log Performed
1999-09-26 Well Log Performed
1999-09-27 Well Log Performed
1999-10-12 Perforation Treatment Performed - Jet Perforation
1999-10-12 Well Log Performed
1999-10-15 Perforation Treatment Performed - Fractured
1999-10-21 Perforation Treatment Performed - Jet Perforation
1999-10-22 Perforation Treatment Performed - Fractured
1999-10-23 Perforation Treatment Performed - Jet Perforation
1999-10-23 Well Log Performed
1999-10-24 Perforation Treatment Performed - Fractured
2004-10-07 Well Log Performed
2004-10-08 Perforation Treatment Performed - Cement Squeeze
2004-10-08 Plug Back Performed
2004-10-12 Plug Back Performed
2004-10-14 Perforation Treatment Performed - Cement Squeeze
2004-10-14 Plug Back Performed
2004-10-22 Perforation Treatment Performed - Jet Perforation
2008-02-14 Perforation Treatment Performed - Jet Perforation
2008-02-14 Well Log Performed
2008-02-15 Well Log Performed
2008-02-18 Perforation Treatment Performed - Fractured
2009-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-01-14 Perforation Treatment Performed - Jet Perforation
2011-01-14 Well Log Performed
2011-01-21 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-09-14 3331.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-12-22 Perforation 3094.00 3094.00 17
1999-10-15 Fracture 2086.00 2098.00 0
1999-10-21 Perforation 1893.00 1901.00 17
1999-10-22 Fracture 1893.00 1901.00 0
1999-10-23 Perforation 1823.00 1830.00 17
1999-10-24 Fracture 1823.00 1830.00 0
2004-10-08 Cement Squeeze 1893.00 1901.00 0
2004-10-08 Cement Squeeze 1823.00 1830.00 0
2004-10-14 Cement Squeeze 2086.00 2098.00 0
2004-10-22 Perforation 3094.00 3099.00 17
2004-10-22 Perforation 2932.00 2935.00 17
1996-01-03 Fracture 3094.00 3094.00 0
2008-02-14 Perforation 3283.00 3285.00 20
2008-02-18 Fracture 3283.00 3285.00 0
2009-10-30 Acid Treatment 3283.00 3285.00 0
2011-01-14 Perforation 2964.00 2968.00 17
2011-01-21 Fracture 2964.00 2968.00 0
1996-01-30 Packing Device Capped w/Cement 3082.00 3090.00 0
1996-02-02 Perforation 2932.00 2935.00 17
1996-02-04 Fracture 2932.00 2935.00 0
1996-02-07 Fracture 2932.00 2935.00 0
1996-02-15 Packing Device Capped w/Cement 2909.00 2918.00 0
1999-09-24 Packing Device Capped w/Cement 2152.00 2160.00 0
1999-10-12 Perforation 2086.00 2098.00 17

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1991-08-22 Lost Circulation 2088.00 2088.00
1991-09-16 Kick 3397.00 3397.00

For data sources see[6]

References