X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455162710000

Well Details

Well ID: 0455162710000
Loading map...
Location: 00/10-27-045-16W5/0
Location Alias: 00/10-27-45-16 W5M
Location Alias 2: 00/10-27-045-16 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 16
Section: 27
County/Municipality: Yellowhead County
Well Name: ASHLAND ET AL OWL RIVER 10-27-45-16
Operator Name: BP Canada Energy Group ULC
License Number: 0061830
License Date: 1976-12-29
License Status: RecCertified
Spud Date: 1977-01-28
Final Drill Date: 1977-08-09
Well Total Depth: 4708.60 m
Surface Hole Latitude: 52.911553
Surface Hole Longitude: -116.235338

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-12-29 Obtained License
1977-01-28 Direction Drilling Operation Performed - 98
1977-03-11 Lost Circulation Occurred
1977-04-29 Well Log Performed
1977-05-01 Lost Circulation Occurred
1977-06-16 Kick Occurred
1977-08-09 Finished Drilling
1977-08-10 Well Log Performed
1977-08-12 Well Log Performed
1977-08-17 Liner Casing Operation Performed
1977-09-05 Perforation Treatment Performed - Jet Perforation
1977-09-06 Drill Stem Test Performed
1977-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-09-09 Drill Stem Test Performed
1977-09-09 Perforation Treatment Performed - Jet Perforation
1977-09-12 Drill Stem Test Performed
1977-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-09-15 Perforation Treatment Performed - Jet Perforation
1977-09-16 Drill Stem Test Performed
1977-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-09-17 Perforation Treatment Performed - Jet Perforation
1977-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-09-21 Perforation Treatment Performed - Jet Perforation
1977-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-09-26 Drill Stem Test Performed
1977-09-28 Well Log Performed
1977-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-09-29 Perforation Treatment Performed - Jet Perforation
1977-10-02 Drill Stem Test Performed
1977-10-02 Perforation Treatment Performed - Jet Perforation
1977-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-10-04 Well Abandoned
1977-10-04 Well Mode changed to Abandoned
1977-10-08 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1977-01-28 3756.40 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-09-05 Perforation 4633.60 4634.50 13
1977-09-15 Perforation 4148.90 4151.10 13
1977-09-16 Packing Device Capped w/Cement 3962.40 3977.60 0
1977-09-17 Perforation 3898.40 3900.50 13
1977-09-17 Perforation 3902.40 3904.50 13
1977-09-20 Packing Device Capped w/Cement 3596.60 3611.90 0
1977-09-21 Perforation 3567.10 3572.60 13
1977-09-23 Packing Device Capped w/Cement 3540.30 3547.90 0
1977-09-29 Perforation 3324.10 3328.40 13
1977-09-29 Packing Device Capped w/Cement 3374.10 3381.80 0
1977-10-02 Perforation 2744.70 2747.50 13
1977-09-05 Perforation 4636.00 4636.60 13
1977-10-02 Perforation 2758.70 2760.60 0
1977-10-04 Packing Device Capped w/Cement 2728.60 2736.50 0
1977-09-05 Perforation 4637.20 4638.10 13
1977-09-08 Packing Device Capped w/Cement 4629.30 4632.40 0
1977-09-09 Perforation 4622.30 4623.50 13
1977-09-09 Perforation 4624.10 4624.70 13
1977-09-13 Packing Device Capped w/Cement 4312.90 4328.20 0
1977-09-15 Perforation 4143.80 4144.40 13
1977-09-15 Perforation 4147.70 4148.30 13

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-03-11 Lost Circulation 1716.00 1729.10
1977-05-01 Lost Circulation 3657.60 3657.60
1977-06-16 Kick 4633.60 4633.60

For data sources see[6]

References