If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455173410000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.926715,"lon":-116.377448,"icon":""}]} |
Location: 00/10-34-045-17W5/0 | |
Location Alias: 00/10-34-45-17 W5M | |
Location Alias 2: 00/10-34-045-17 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 17 | |
Section: 34 | |
County/Municipality: Yellowhead County | |
Well Name: KAISER ET AL VOYAGER 10-34-45-17 | |
Operator Name: Obsidian Energy Ltd. | |
License Number: 0151699 | |
License Date: 1992-02-12 | |
License Status: Abandoned | |
Spud Date: 1992-02-17 | |
Final Drill Date: 1992-03-19 | |
Well Total Depth: 2932.00 m | |
Surface Hole Latitude: 52.926715 | |
Surface Hole Longitude: -116.377448 |
Date | Event |
---|---|
1992-02-12 | Obtained License |
1992-02-20 | Surface Casing Operation Performed |
1992-02-23 | Lost Circulation Occurred |
1992-03-03 | Drill Stem Test Performed |
1992-03-08 | Kick Occurred |
1992-03-08 | Well Log Performed |
1992-03-11 | Intermediate Casing Operation Performed |
1992-03-17 | Drill Stem Test Performed |
1992-03-19 | Finished Drilling |
1992-03-19 | Well Log Performed |
1992-03-20 | Well Log Performed |
1992-03-21 | Liner Casing Operation Performed |
1992-03-23 | Rig Released |
1993-02-04 | Well Log Performed |
1993-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-02-08 | Well Log Performed |
1993-02-09 | Perforation Treatment Performed - Jet Perforation |
1993-02-09 | Well Mode changed to Drilled and Cased |
1993-02-13 | Perforation Treatment Performed - Fractured |
1993-03-01 | Well Began Production |
1993-03-01 | Well Fluid changed to Crude Oil |
1993-03-01 | Well Mode changed to Pumping |
1994-04-05 | Well Fluid changed to Crude Oil |
1994-04-05 | Well Mode changed to Suspended |
1999-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-25 | Plug Back Performed |
1999-06-25 | Well Log Performed |
1999-06-26 | Well Log Performed |
1999-06-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-06-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-30 | Perforation Treatment Performed - Jet Perforation |
1999-06-30 | Perforation Treatment Performed - Remedial Casing |
1999-06-30 | Well Log Performed |
1999-07-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-07-01 | Perforation Treatment Performed - Jet Perforation |
1999-07-01 | Perforation Treatment Performed - Remedial Casing |
1999-07-01 | Well Log Performed |
1999-07-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-07-02 | Perforation Treatment Performed - Jet Perforation |
1999-07-02 | Perforation Treatment Performed - Remedial Casing |
1999-07-02 | Well Log Performed |
1999-07-03 | Well Abandoned |
1999-07-03 | Well Fluid changed to Crude Oil |
1999-07-03 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-02-08 | Packing Device Capped w/Cement | 2392.00 | 2400.00 | 0 |
1999-07-01 | Perforation | 950.00 | 951.00 | 13 |
1999-07-01 | Remedial Casing Cementing | 950.00 | 951.00 | 0 |
1999-07-01 | Packing Device Capped w/Cement | 937.00 | 945.00 | 0 |
1999-07-02 | Perforation | 645.00 | 646.00 | 13 |
1999-07-02 | Remedial Casing Cementing | 645.00 | 646.00 | 0 |
1999-07-02 | Packing Device Capped w/Cement | 632.00 | 640.00 | 0 |
1993-02-09 | Perforation | 2339.00 | 2342.00 | 17 |
1993-02-09 | Perforation | 2346.50 | 2353.00 | 17 |
1993-02-13 | Fracture | 2339.00 | 2353.00 | 0 |
1999-06-25 | Packing Device Capped w/Cement | 2318.00 | 2326.00 | 0 |
1999-06-30 | Perforation | 1855.00 | 1856.00 | 13 |
1999-06-30 | Acid Treatment | 1855.00 | 1856.00 | 0 |
1999-06-30 | Remedial Casing Cementing | 1855.00 | 1856.00 | 0 |
1999-06-30 | Packing Device Capped w/Cement | 1845.00 | 1853.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 2565 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1992-02-23 | Lost Circulation | 1202.00 | 1445.00 |
1992-03-08 | Kick | 2796.00 | 2796.00 |
For data sources see[6]