X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464200503000

Well Details

Well ID: 0464200503000
Loading map...
Location: 00/03-05-046-20W4/0
Location Alias: 00/03-05-46-20 W4M
Location Alias 2: 00/03-05-046-20 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 20
Section: 05
County/Municipality: Camrose County
Well Name: SYNCO BITTRNLK 3-5-46-20
Operator Name: SynCo Exploration Inc.
License Number: 0406527
License Date: 2008-12-18
License Status: RecCertified
Spud Date: 2009-01-01
Final Drill Date: 2009-01-04
Well Total Depth: 1338.00 m
Surface Hole Latitude: 52.932598
Surface Hole Longitude: -112.875618

For data sources see[1][2]

Well History

Date Event
2008-12-18 Obtained License
2009-01-01 Surface Casing Operation Performed
2009-01-02 Direction Drilling Operation Performed - Deviate
2009-01-04 Finished Drilling
2009-01-04 Well Mode changed to Drilled and Cased
2009-01-05 Production Casing Operation Performed
2009-01-05 Well Log Performed
2009-01-06 Rig Released
2009-12-21 Well Mode changed to Closed
2010-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-23 Plug Back Performed
2010-10-23 Well Log Performed
2010-10-24 Well Log Performed
2010-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-27 Perforation Treatment Performed - Jet Perforation
2010-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-28 Perforation Treatment Performed - Remedial Casing
2010-10-28 Plug Back Performed
2010-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-29 Perforation Treatment Performed - Jet Perforation
2010-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-30 Perforation Treatment Performed - Remedial Casing
2010-10-30 Plug Back Performed
2010-12-08 Perforation Treatment Performed - Jet Perforation
2010-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-10 Perforation Treatment Performed - Remedial Casing
2010-12-10 Plug Back Performed
2010-12-19 Perforation Treatment Performed - Jet Perforation
2010-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-20 Perforation Treatment Performed - Remedial Casing
2010-12-20 Plug Back Performed
2011-01-16 Well Abandoned
2011-01-16 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-02 250.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-23 Packing Device Capped w/Cement 1226.60 1235.00 0
2010-10-30 Remedial Casing Cementing 352.00 354.20 0
2010-10-30 Packing Device Capped w/Cement 341.60 350.00 0
2010-12-08 Perforation 259.00 261.00 13
2010-12-08 Perforation 258.80 260.80 13
2010-12-10 Remedial Casing Cementing 258.80 261.00 0
2010-12-10 Packing Device Capped w/Cement 246.80 255.80 0
2010-12-19 Perforation 221.50 224.50 20
2010-12-19 Perforation 221.30 224.30 20
2010-12-19 Perforation 222.00 222.60 18
2010-12-20 Acid Treatment 221.30 224.30 0
2010-10-27 Perforation 475.20 477.20 20
2010-12-20 Remedial Casing Cementing 221.30 224.50 0
2010-12-20 Packing Device Capped w/Cement 209.30 218.30 0
2010-10-27 Perforation 475.00 477.00 20
2010-10-27 Acid Treatment 475.00 477.20 0
2010-10-28 Remedial Casing Cementing 475.00 477.20 0
2010-10-28 Packing Device Capped w/Cement 464.40 473.00 0
2010-10-29 Perforation 352.00 354.00 20
2010-10-29 Perforation 352.20 354.20 20
2010-10-29 Acid Treatment 352.00 354.20 0

For data sources see[5]



References