X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464281001000

Well Details

Well ID: 0464281001000
Loading map...
Location: 00/01-10-046-28W4/0
Location Alias: 00/01-10-46-28 W4M
Location Alias 2: 00/01-10-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 10
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 1-10-46-28
Operator Name: Cenovus Energy Inc.
License Number: 0110037
License Date: 1984-10-18
License Status: Abandoned
Spud Date: 1984-12-04
Final Drill Date: 1984-12-25
Well Total Depth: 2225.00 m
Surface Hole Latitude: 52.947284
Surface Hole Longitude: -113.976329

For data sources see[1][2]

Well History

Date Event
1984-10-18 Obtained License
1984-12-05 Surface Casing Operation Performed
1984-12-13 Direction Drilling Operation Performed - Straighten Hole
1984-12-25 Finished Drilling
1984-12-25 Well Mode changed to Drilled and Cased
1984-12-26 Well Log Performed
1984-12-28 Production Casing Operation Performed
1984-12-29 Rig Released
1984-12-31 Well Log Performed
1985-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-14 Perforation Treatment Performed - Jet Perforation
1985-02-17 Well Began Production
1985-02-17 Well Fluid changed to Crude Oil
1985-02-17 Well Mode changed to Flowing
1986-09-27 Perforation Treatment Performed - Cement Squeeze
1986-10-01 Perforation Treatment Performed - Jet Perforation
1986-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-02 Perforation Treatment Performed - Cement Squeeze
1986-10-03 Perforation Treatment Performed - Jet Perforation
1986-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-08-14 Well Log Performed
1992-08-16 Perforation Treatment Performed - Cement Squeeze
1992-08-21 Perforation Treatment Performed - Jet Perforation
1992-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-08-22 Well Log Performed
1995-12-03 Well Log Performed
1995-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-21 Plug Back Performed
1995-12-21 Well Log Performed
1995-12-22 Well Fluid changed to Crude Oil
1995-12-22 Well Mode changed to Abandoned and Whipstocked
2003-11-06 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-12-13 1782.00 Straighten Hole

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-01-14 Perforation 2194.70 2196.40 13
1992-08-21 Perforation 2202.00 2202.70 13
1992-08-22 Acid Treatment 2202.00 2202.70 0
1995-12-21 Packing Device Capped w/Cement 2176.00 2184.00 0
1985-01-14 Acid Treatment 2194.70 2196.40 0
1986-09-27 Cement Squeeze 2194.70 2196.40 0
1986-10-01 Perforation 2200.00 2201.00 13
1986-10-02 Acid Treatment 2200.00 2201.00 0
1986-10-02 Cement Squeeze 2200.00 2201.00 0
1986-10-03 Perforation 2197.10 2198.10 13
1986-10-04 Acid Treatment 2197.10 2198.10 0
1992-08-16 Cement Squeeze 2197.10 2198.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 4375 0.0 0.0 0.0
1986 5999 0.0 0.0 0.0
1987 7640 0.0 0.0 0.0
1988 7814 0.0 0.0 0.0
1989 3491 0.0 0.0 0.0
1990 3223 0.0 0.0 0.0
1991 876 0.0 0.0 0.0
1992 2980 0.0 0.0 0.0
1993 5638 0.0 0.0 0.0
1994 5903 0.0 0.0 0.0

For data sources see[6]

References