X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464282504000

Well Details

Well ID: 0464282504000
Loading map...
Location: 00/04-25-046-28W4/0
Location Alias: 00/04-25-46-28 W4M
Location Alias 2: 00/04-25-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 25
County/Municipality: Pigeon Lake 138A
Well Name: ESSO PIGEON LAKE NO.4-25
Operator Name: Imperial Oil Resources Limited
License Number: 0007162
License Date: 1953-10-08
License Status: Abandoned
Spud Date: 1953-10-10
Final Drill Date: 1953-11-13
Well Total Depth: 2158.00 m
Surface Hole Latitude: 52.990710
Surface Hole Longitude: -113.942924

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-10-08 Obtained License
1953-11-08 Liner Casing Operation Performed
1953-11-13 Finished Drilling
1953-11-13 Well Mode changed to Drilled and Cased
1953-11-16 Perforation Treatment Performed - Bullet Perforation
1953-11-16 Perforation Treatment Performed - Jet Perforation
1953-11-19 Well Began Production
1953-11-19 Well Fluid changed to Crude Oil
1953-11-19 Well Mode changed to Flowing
1983-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-15 Well Fluid changed to Crude Oil
1983-04-15 Well Mode changed to Pumping
1985-09-28 Perforation Treatment Performed - Cement Squeeze
1985-09-29 Well Log Performed
1985-10-02 Perforation Treatment Performed - Jet Perforation
1985-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-04 Well Log Performed
1989-03-21 Perforation Treatment Performed - Jet Perforation
1989-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-11 Perforation Treatment Performed - Jet Perforation
1989-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-10 Perforation Treatment Performed - Jet Perforation
1991-05-10 Well Log Performed
1991-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-26 Well Log Performed
1993-11-03 Perforation Treatment Performed - Jet Perforation
1993-11-03 Well Log Performed
1993-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-22 Well Log Performed
1993-12-01 Well Fluid changed to Gas
1993-12-01 Well Mode changed to Flowing
1996-09-30 Well Log Performed
1997-12-16 Perforation Treatment Performed - Jet Perforation
1997-12-16 Well Log Performed
1999-11-24 Perforation Treatment Performed - Jet Perforation
1999-11-24 Well Log Performed
1999-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-20 Perforation Treatment Performed - Jet Perforation
2000-07-20 Well Log Performed
2000-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-12-18 Well Log Performed
2000-12-19 Perforation Treatment Performed - Jet Perforation
2000-12-19 Well Log Performed
2000-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-10 Perforation Treatment Performed - Jet Perforation
2001-12-10 Well Log Performed
2001-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-07-01 Well Fluid changed to Gas
2005-07-01 Well Mode changed to Suspended
2013-02-07 Well Log Performed
2014-01-30 Well Log Performed
2014-01-31 Perforation Treatment Performed - Cement Plug
2014-01-31 Plug Back Performed
2014-01-31 Well Fluid changed to Gas
2014-01-31 Well Mode changed to Abandoned Zone
2014-02-01 Well Log Performed
2014-02-03 Perforation Treatment Performed - Jet Perforation
2014-02-03 Well Log Performed
2014-02-04 Perforation Treatment Performed - Cement Plug
2014-02-04 Perforation Treatment Performed - Remedial Casing
2014-02-07 Perforation Treatment Performed - Cement Plug
2014-02-07 Perforation Treatment Performed - Jet Perforation
2014-02-07 Perforation Treatment Performed - Remedial Casing
2014-02-08 Perforation Treatment Performed - Cement Plug
2015-01-28 Well Abandoned
2015-01-28 Well Fluid changed to Gas
2015-01-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-11-16 Bullet Perforation 2147.00 2153.10 13
1989-05-11 Perforation 2152.00 2153.50 14
1989-05-12 Acid Treatment 2152.00 2153.50 0
1991-05-10 Perforation 2148.20 2149.20 20
1991-05-13 Acid Treatment 2148.20 2149.20 0
1993-11-03 Perforation 2120.00 2123.00 20
1993-11-05 Acid Treatment 2120.00 2123.00 0
1997-12-16 Perforation 2109.70 2112.70 16
1999-11-24 Perforation 2083.50 2086.50 13
1999-11-25 Acid Treatment 2083.50 2086.50 0
2000-07-20 Perforation 2067.00 2071.00 13
1953-11-16 Perforation 2147.00 2153.10 13
2000-07-24 Acid Treatment 2067.00 2071.00 0
2000-11-23 Acid Treatment 2067.00 2071.00 0
2000-12-19 Perforation 2046.50 2049.50 13
2000-12-19 Perforation 2051.50 2053.50 13
2000-12-20 Acid Treatment 2046.50 2049.50 0
2000-12-20 Acid Treatment 2051.50 2053.50 0
2001-12-10 Perforation 2027.50 2033.00 13
2001-12-11 Acid Treatment 2027.50 2033.00 0
2002-03-12 Acid Treatment 2027.50 2033.00 0
2014-01-31 Cement Plug 1943.00 2017.00 0
1983-04-12 Acid Treatment 2147.00 2153.10 0
2014-02-03 Perforation 1621.80 1622.80 17
2014-02-03 Perforation 1604.80 1605.80 17
2014-02-03 Perforation 1581.00 1582.00 17
2014-02-03 Perforation 1466.10 1467.10 17
2014-02-03 Perforation 1417.30 1418.30 17
2014-02-03 Perforation 622.00 623.00 17
2014-02-03 Perforation 589.00 590.00 17
2014-02-04 Remedial Casing Cementing 589.00 1622.80 0
2014-02-04 Cement Plug 593.00 1943.00 0
2014-02-07 Perforation 580.00 581.00 17
1985-09-28 Cement Squeeze 2147.00 2150.00 0
2014-02-07 Perforation 549.00 550.00 17
2014-02-07 Perforation 525.00 526.00 17
2014-02-07 Perforation 512.00 513.00 17
2014-02-07 Perforation 502.00 503.00 17
2014-02-07 Perforation 403.00 404.00 17
2014-02-07 Perforation 390.00 391.00 17
2014-02-07 Perforation 261.00 262.00 17
2014-02-07 Perforation 230.00 231.00 17
2014-02-07 Perforation 206.00 207.00 17
2014-02-07 Perforation 196.00 197.00 17
1985-10-02 Perforation 2155.20 2155.70 13
2014-02-07 Remedial Casing Cementing 196.00 581.00 0
2014-02-07 Cement Plug 190.60 586.50 0
2014-02-08 Cement Plug 150.00 190.00 0
1985-10-03 Acid Treatment 2155.20 2155.70 0
1985-10-04 Acid Treatment 2155.20 2155.70 0
1989-03-21 Perforation 2151.70 2152.20 14
1989-03-22 Acid Treatment 2151.70 2152.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1983 7291 0.0 0.0 0.0
1984 7135 0.0 0.0 0.0
1985 6378 0.0 0.0 0.0
1986 5901 0.0 0.0 0.0
1987 6531 0.0 0.0 0.0
1988 8354 0.0 0.0 0.0
1989 6249 0.0 0.0 0.0
1990 8476 0.0 0.0 0.0
1991 7389 0.0 0.0 0.0
1992 8429 0.0 0.0 0.0
1993 6712 0.0 0.0 0.0
1994 8458 0.0 0.0 0.0
1995 8425 0.0 0.0 0.0
1996 8130 0.0 0.0 0.0
1997 8624 0.0 0.0 0.0
1998 8272 0.0 0.0 0.0
1999 8160 0.0 0.0 0.0
2000 8588 0.0 0.0 0.0
2001 7131 0.0 0.0 0.0
2002 8452 0.0 0.0 0.0
2003 7185 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 4343 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References