X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464282514000

Well Details

Well ID: 0464282514000
Loading map...
Location: 00/14-25-046-28W4/0
Location Alias: 00/14-25-46-28 W4M
Location Alias 2: 00/14-25-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 25
County/Municipality: Pigeon Lake 138A
Well Name: ESSO PIGEON LAKE NO 14-25
Operator Name: Imperial Oil Resources Limited
License Number: 0008240
License Date: 1954-07-15
License Status: Abandoned
Spud Date: 1954-08-06
Final Drill Date: 1954-09-15
Well Total Depth: 2179.30 m
Surface Hole Latitude: 53.001549
Surface Hole Longitude: -113.938045

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-07-15 Obtained License
1954-09-11 Liner Casing Operation Performed
1954-09-15 Finished Drilling
1954-09-15 Well Mode changed to Drilled and Cased
1954-09-18 Perforation Treatment Performed - Jet Perforation
1954-09-18 Well Began Production
1954-09-18 Well Fluid changed to Crude Oil
1954-09-18 Well Mode changed to Flowing
1984-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-13 Well Log Performed
1984-09-21 Perforation Treatment Performed - Cement Squeeze
1984-09-26 Perforation Treatment Performed - Jet Perforation
1984-09-26 Well Log Performed
1984-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-29 Well Fluid changed to Crude Oil
1984-09-29 Well Mode changed to Pumping
1988-03-16 Well Log Performed
1988-03-17 Perforation Treatment Performed - Cement Squeeze
1988-03-21 Perforation Treatment Performed - Jet Perforation
1988-03-21 Well Log Performed
1988-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-10 Perforation Treatment Performed - Jet Perforation
1992-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-05 Perforation Treatment Performed - Jet Perforation
1992-11-09 Well Fluid changed to Crude Oil
1992-11-09 Well Mode changed to Suspended
1996-11-01 Well Fluid changed to Crude Oil
1996-11-01 Well Mode changed to Pumping
1996-11-21 Well Log Performed
1996-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-23 Perforation Treatment Performed - Jet Perforation
1996-11-23 Well Log Performed
1998-09-01 Well Fluid changed to Crude Oil
1998-09-01 Well Mode changed to Suspended
1999-02-28 Perforation Treatment Performed - Jet Perforation
1999-02-28 Well Log Performed
1999-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-01 Well Fluid changed to Crude Oil
1999-03-01 Well Mode changed to Pumping
2000-10-01 Well Fluid changed to Crude Oil
2000-10-01 Well Mode changed to Suspended
2002-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-19 Plug Back Performed
2002-10-19 Well Fluid changed to Crude Oil
2002-10-19 Well Mode changed to Abandoned Zone
2002-10-21 Perforation Treatment Performed - Cement Plug
2002-10-21 Plug Back Performed
2002-10-22 Perforation Treatment Performed - Cement Plug
2002-10-22 Plug Back Performed
2003-08-18 Well Abandoned
2003-08-18 Well Fluid changed to Crude Oil
2003-08-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-09-18 Perforation 2168.30 2173.80 13
1989-07-10 Perforation 2167.70 2168.70 13
1989-07-10 Acid Treatment 2167.70 2169.70 0
1992-03-05 Perforation 2164.00 2165.00 20
1992-03-05 Acid Treatment 2164.00 2165.00 0
1996-11-23 Perforation 2151.80 2152.40 17
1996-11-23 Acid Treatment 2151.80 2152.40 0
1999-02-28 Perforation 2133.70 2134.70 20
1999-03-01 Acid Treatment 2133.70 2134.70 0
2002-10-19 Packing Device Capped w/Cement 1562.00 2125.00 0
2002-10-21 Cement Plug 820.00 1562.00 0
1984-02-01 Acid Treatment 2168.30 2173.80 0
2002-10-22 Cement Plug 177.00 820.00 0
1984-09-21 Cement Squeeze 2168.30 2173.80 0
1984-09-26 Perforation 2173.40 2173.90 7
1984-09-27 Acid Treatment 2173.40 2173.90 0
1988-03-17 Cement Squeeze 2173.40 2173.90 0
1988-03-21 Perforation 2168.70 2169.70 13
1988-03-22 Acid Treatment 2168.70 2169.70 0
1988-05-20 Acid Treatment 2168.70 2169.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1983 194 0.0 0.0 0.0
1984 2153 0.0 0.0 0.0
1985 5800 0.0 0.0 0.0
1986 6137 0.0 0.0 0.0
1987 8429 0.0 0.0 0.0
1988 5824 0.0 0.0 0.0
1989 8115 0.0 0.0 0.0
1990 8584 0.0 0.0 0.0
1991 8143 0.0 0.0 0.0
1992 4806 0.0 0.0 0.0
1996 723 0.0 0.0 0.0
1997 8644 0.0 0.0 0.0
1998 4484 0.0 0.0 0.0
1999 7072 0.0 0.0 0.0
2000 5641 0.0 0.0 0.0

For data sources see[5]

References