X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464283510000

Well Details

Well ID: 0464283510000
Loading map...
Location: 00/10-35-046-28W4/0
Location Alias: 00/10-35-46-28 W4M
Location Alias 2: 00/10-35-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 35
County/Municipality: Pigeon Lake 138A
Well Name: ESSO PIGEON LAKE NO. 10-35
Operator Name: Imperial Oil Resources Limited
License Number: 0008003
License Date: 1954-08-05
License Status: Abandoned
Spud Date: 1954-09-23
Final Drill Date: 1954-11-06
Well Total Depth: 2169.90 m
Surface Hole Latitude: 53.012454
Surface Hole Longitude: -113.953985

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-08-05 Obtained License
1954-10-29 Liner Casing Operation Performed
1954-11-06 Finished Drilling
1954-11-06 Well Mode changed to Drilled and Cased
1954-11-08 Well Log Performed
1954-11-10 Perforation Treatment Performed - Bullet Perforation
1954-11-10 Perforation Treatment Performed - Jet Perforation
1954-11-11 Well Began Production
1954-11-11 Well Fluid changed to Crude Oil
1954-11-11 Well Mode changed to Flowing
1974-02-01 Perforation Treatment Performed - Jet Perforation
1974-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-27 Perforation Treatment Performed - Cement Squeeze
1982-09-28 Perforation Treatment Performed - Cement Squeeze
1982-10-04 Perforation Treatment Performed - Open-Hole Completion
1982-10-06 Perforation Treatment Performed - Jet Perforation
1982-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-13 Well Log Performed
1985-08-30 Well Fluid changed to Crude Oil
1985-08-30 Well Mode changed to Pumping
1986-09-25 Well Log Performed
1986-09-28 Well Log Performed
1986-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-09-29 Perforation Treatment Performed - Cement Squeeze
1986-09-30 Perforation Treatment Performed - Jet Perforation
1986-09-30 Well Log Performed
1987-01-06 Well Log Performed
1987-05-26 Perforation Treatment Performed - Cement Squeeze
1987-05-26 Well Log Performed
1987-05-28 Perforation Treatment Performed - Jet Perforation
1987-05-28 Well Log Performed
1987-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-11-01 Well Fluid changed to Crude Oil
1991-11-01 Well Mode changed to Suspended
1992-11-18 Perforation Treatment Performed - Jet Perforation
1992-11-18 Well Log Performed
1992-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-01 Well Fluid changed to Crude Oil
1992-12-01 Well Mode changed to Pumping
1993-01-26 Well Log Performed
1993-01-27 Perforation Treatment Performed - Cement Squeeze
1993-01-29 Perforation Treatment Performed - Jet Perforation
1993-02-03 Perforation Treatment Performed - Cement Squeeze
1993-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-04 Perforation Treatment Performed - Jet Perforation
2000-02-01 Well Fluid changed to Crude Oil
2000-02-01 Well Mode changed to Suspended
2002-04-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-04-15 Perforation Treatment Performed - Cement Plug
2002-04-15 Plug Back Performed
2002-04-15 Well Fluid changed to Crude Oil
2002-04-15 Well Mode changed to Abandoned Zone
2002-04-16 Perforation Treatment Performed - Cement Plug
2002-04-16 Plug Back Performed
2002-12-12 Well Abandoned
2002-12-12 Well Fluid changed to Crude Oil
2002-12-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-11-10 Bullet Perforation 2126.90 2133.00 13
1986-09-29 Cement Squeeze 2154.00 2156.00 0
1986-09-29 Packing Device Capped w/Cement 2154.10 2158.00 0
1986-09-30 Perforation 2151.60 2152.10 13
1987-05-26 Cement Squeeze 2151.60 2152.00 0
1987-05-28 Perforation 2149.00 2149.50 13
1987-05-29 Acid Treatment 2149.00 2149.50 0
1988-08-30 Acid Treatment 2149.00 2149.50 0
1992-11-18 Perforation 2140.90 2141.50 20
1992-11-19 Acid Treatment 2140.90 2141.50 0
1993-01-27 Cement Squeeze 2140.90 2141.50 0
1954-11-10 Perforation 2126.90 2133.00 13
1993-01-29 Perforation 2137.60 2138.30 20
1993-02-03 Cement Squeeze 2137.60 2138.30 0
1993-02-04 Perforation 2133.30 2134.00 20
1993-02-04 Acid Treatment 2133.30 2134.00 0
2002-04-15 Packing Device Capped w/Cement 1964.80 2118.30 0
2002-04-15 Cement Plug 1530.00 1684.00 0
2002-04-16 Cement Plug 96.70 1530.00 0
1974-02-01 Perforation 2148.20 2151.30 7
1974-02-06 Acid Treatment 2148.20 2151.30 0
1982-09-27 Cement Squeeze 2126.90 2151.30 0
1982-09-28 Cement Squeeze 2126.90 2151.30 0
1982-10-04 Open Hole/Barefoot Completion 2159.80 2169.90 0
1982-10-06 Perforation 2154.00 2156.00 7
1982-10-07 Acid Treatment 2154.00 2156.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 1611 0.0 0.0 0.0
1974 7486 0.0 0.0 0.0
1975 6264 0.0 0.0 0.0
1976 5637 0.0 0.0 0.0
1977 5777 0.0 0.0 0.0
1978 5705 0.0 0.0 0.0
1979 8663 0.0 0.0 0.0
1980 7653 0.0 0.0 0.0
1981 5477 0.0 0.0 0.0
1982 2536 0.0 0.0 0.0
1983 3072 0.0 0.0 0.0
1984 5329 0.0 0.0 0.0
1985 6763 0.0 0.0 0.0
1986 6358 0.0 0.0 0.0
1987 4627 0.0 0.0 0.0
1988 7953 0.0 0.0 0.0
1989 7766 0.0 0.0 0.0
1990 3176 0.0 0.0 0.0
1992 519 0.0 0.0 0.0
1993 4055 0.0 0.0 0.0
1994 4162 0.0 0.0 0.0
1995 3572 0.0 0.0 0.0
1996 7779 0.0 0.0 0.0
1997 8719 0.0 0.0 0.0
1998 8371 0.0 0.0 0.0
1999 1032 0.0 0.0 0.0

For data sources see[5]

References