X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464283515000

Well Details

Well ID: 0464283515000
Loading map...
Location: 00/15-35-046-28W4/0
Location Alias: 00/15-35-46-28 W4M
Location Alias 2: 00/15-35-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 35
County/Municipality: Pigeon Lake 138A
Well Name: ESSO PIGEON LAKE 15-35
Operator Name: Imperial Oil Resources Limited
License Number: 0006166
License Date: 1953-03-06
License Status: RecExempt
Spud Date: 1953-03-07
Final Drill Date: 1953-04-20
Well Total Depth: 2170.00 m
Surface Hole Latitude: 53.015930
Surface Hole Longitude: -113.954436

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-03-06 Obtained License
1953-04-15 Drill Stem Test Performed
1953-04-16 Drill Stem Test Performed
1953-04-17 Production Casing Operation Performed
1953-04-20 Finished Drilling
1953-04-20 Perforation Treatment Performed - Open-Hole Completion
1953-04-20 Well Mode changed to Drilled and Cased
1953-04-23 Well Began Production
1953-04-23 Well Fluid changed to Crude Oil
1953-04-23 Well Mode changed to Flowing
1984-10-24 Well Log Performed
1984-10-29 Perforation Treatment Performed - Open-Hole Completion
1984-12-05 Well Log Performed
1985-01-08 Well Log Performed
1985-11-16 Well Fluid changed to Crude Oil
1985-11-16 Well Mode changed to Pumping
1987-06-05 Perforation Treatment Performed - Cement Plug
1987-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-22 Well Fluid changed to Crude Oil
1990-04-22 Well Mode changed to Suspended
1996-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-28 Plug Back Performed
1996-07-03 Well Abandoned
1996-07-03 Well Fluid changed to Crude Oil
1996-07-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-04-20 Open Hole/Barefoot Completion 2144.00 2156.50 0
1984-10-29 Open Hole/Barefoot Completion 2144.00 2170.00 0
1987-06-05 Cement Plug 2150.00 2170.00 0
1987-06-09 Acid Treatment 2144.00 2150.00 0
1996-06-28 Packing Device Capped w/Cement 2124.00 2132.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1971 4648 0.0 0.0 0.0
1972 5199 0.0 0.0 0.0
1973 6478 0.0 0.0 0.0
1974 6957 0.0 0.0 0.0
1975 4848 0.0 0.0 0.0
1976 5967 0.0 0.0 0.0
1977 3682 0.0 0.0 0.0
1978 2500 0.0 0.0 0.0
1979 8500 0.0 0.0 0.0
1980 7594 0.0 0.0 0.0
1981 5974 0.0 0.0 0.0
1982 4758 0.0 0.0 0.0
1983 108 0.0 0.0 0.0
1985 3204 0.0 0.0 0.0
1986 5989 0.0 0.0 0.0
1987 4674 0.0 0.0 0.0
1988 5746 0.0 0.0 0.0
1989 4975 0.0 0.0 0.0

For data sources see[5]

References