X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464283613000

Well Details

Well ID: 0464283613000
Loading map...
Location: 00/13-36-046-28W4/0
Location Alias: 00/13-36-46-28 W4M
Location Alias 2: 00/13-36-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 36
County/Municipality: Pigeon Lake 138A
Well Name: ESSO PIGEON LAKE 13-36
Operator Name: Imperial Oil Resources Limited
License Number: 0005926
License Date: 1953-01-08
License Status: Abandoned
Spud Date: 1953-05-20
Final Drill Date: 1953-06-30
Well Total Depth: 2185.40 m
Surface Hole Latitude: 53.015927
Surface Hole Longitude: -113.942886

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-01-08 Obtained License
1953-06-19 Drill Stem Test Performed
1953-06-24 Liner Casing Operation Performed
1953-06-30 Finished Drilling
1953-06-30 Well Mode changed to Drilled and Cased
1953-07-02 Perforation Treatment Performed - Bullet Perforation
1953-07-02 Perforation Treatment Performed - Jet Perforation
1953-07-03 Well Began Production
1953-07-03 Well Fluid changed to Crude Oil
1953-07-03 Well Mode changed to Flowing
1972-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-25 Well Fluid changed to Crude Oil
1980-09-25 Well Mode changed to Pumping
1985-01-15 Well Log Performed
1985-01-21 Well Log Performed
1985-02-01 Well Log Performed
1985-02-04 Perforation Treatment Performed - Cement Squeeze
1985-02-11 Perforation Treatment Performed - Jet Perforation
1985-02-11 Well Log Performed
1985-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-05 Well Log Performed
1990-11-07 Well Log Performed
1990-11-10 Perforation Treatment Performed - Jet Perforation
1990-11-10 Well Log Performed
1990-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-14 Well Fluid changed to Crude Oil
1992-04-14 Well Mode changed to Suspended
1995-01-06 Perforation Treatment Performed - Jet Perforation
1995-02-09 Well Fluid changed to Crude Oil
1995-02-09 Well Mode changed to Pumping
1997-05-14 Perforation Treatment Performed - Jet Perforation
1997-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-20 Perforation Treatment Performed - Jet Perforation
1997-05-20 Well Log Performed
1997-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-21 Perforation Treatment Performed - Jet Perforation
1998-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-01 Well Fluid changed to Crude Oil
1999-01-01 Well Mode changed to Suspended
2000-01-21 Perforation Treatment Performed - Jet Perforation
2000-01-25 Well Fluid changed to Crude Oil
2000-01-25 Well Mode changed to Flowing
2000-10-01 Well Fluid changed to Crude Oil
2000-10-01 Well Mode changed to Suspended
2005-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-03 Perforation Treatment Performed - Cement Plug
2005-02-03 Plug Back Performed
2005-02-03 Well Fluid changed to Crude Oil
2005-02-03 Well Mode changed to Abandoned Zone
2005-02-04 Perforation Treatment Performed - Jet Perforation
2005-02-05 Perforation Treatment Performed - Remedial Casing
2005-02-24 Well Log Performed
2005-06-08 Well Abandoned
2005-06-08 Well Fluid changed to Crude Oil
2005-06-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-07-02 Bullet Perforation 2172.90 2179.00 13
1997-05-14 Perforation 2155.00 2156.00 16
1997-05-15 Acid Treatment 2155.00 2156.00 0
1997-05-20 Perforation 2152.00 2153.00 16
1997-05-21 Acid Treatment 2152.00 2153.00 0
1998-01-21 Perforation 2143.00 2144.00 17
1998-01-22 Acid Treatment 2143.00 2144.00 0
2000-01-21 Perforation 2122.00 2123.00 20
2000-01-21 Perforation 2112.80 2113.80 20
2005-02-03 Packing Device Capped w/Cement 1984.30 2097.80 0
2005-02-03 Cement Plug 1551.00 1704.00 0
1953-07-02 Perforation 2172.90 2179.00 13
2005-02-04 Perforation 835.50 836.00 20
2005-02-05 Remedial Casing Cementing 835.50 836.00 0
1972-12-15 Acid Treatment 2172.90 2179.00 0
1985-02-04 Cement Squeeze 2172.90 2179.00 0
1985-02-11 Perforation 2178.00 2178.50 13
1985-02-12 Acid Treatment 2178.00 2178.50 0
1990-11-10 Perforation 2174.00 2175.00 20
1990-11-12 Acid Treatment 2174.00 2175.00 0
1995-01-06 Perforation 2163.20 2163.70 99

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 3817 0.0 0.0 0.0
1971 4725 0.0 0.0 0.0
1972 6090 0.0 0.0 0.0
1973 6987 0.0 0.0 0.0
1974 7030 0.0 0.0 0.0
1975 4229 0.0 0.0 0.0
1976 6255 0.0 0.0 0.0
1977 4809 0.0 0.0 0.0
1978 4514 0.0 0.0 0.0
1979 8008 0.0 0.0 0.0
1980 7636 0.0 0.0 0.0
1981 7611 0.0 0.0 0.0
1982 6960 0.0 0.0 0.0
1983 4534 0.0 0.0 0.0
1984 4529 0.0 0.0 0.0
1985 5682 0.0 0.0 0.0
1986 5207 0.0 0.0 0.0
1987 7623 0.0 0.0 0.0
1988 8445 0.0 0.0 0.0
1989 8139 0.0 0.0 0.0
1990 7601 0.0 0.0 0.0
1991 8165 0.0 0.0 0.0
1992 2177 0.0 0.0 0.0
1995 6463 0.0 0.0 0.0
1996 8754 0.0 0.0 0.0
1997 6724 0.0 0.0 0.0
1998 3830 0.0 0.0 0.0
2000 5658 0.0 0.0 0.0

For data sources see[5]

References