X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464283614000

Well Details

Well ID: 0464283614000
Loading map...
Location: 00/14-36-046-28W4/0
Location Alias: 00/14-36-46-28 W4M
Location Alias 2: 00/14-36-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 36
County/Municipality: Pigeon Lake 138A
Well Name: ESSO BGLEN 14-36-46-28
Operator Name: Imperial Oil Resources Limited
License Number: 0004738
License Date: 1952-05-03
License Status: Abandoned
Spud Date: 1952-06-10
Final Drill Date: 1952-08-18
Well Total Depth: 2206.80 m
Surface Hole Latitude: 53.015928
Surface Hole Longitude: -113.936888

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-05-03 Obtained License
1952-06-24 Drill Stem Test Performed
1952-07-02 Drill Stem Test Performed
1952-07-19 Drill Stem Test Performed
1952-07-20 Drill Stem Test Performed
1952-07-26 Drill Stem Test Performed
1952-07-28 Liner Casing Operation Performed
1952-08-05 Drill Stem Test Performed
1952-08-06 Drill Stem Test Performed
1952-08-08 Drill Stem Test Performed
1952-08-09 Drill Stem Test Performed
1952-08-10 Drill Stem Test Performed
1952-08-16 Drill Stem Test Performed
1952-08-18 Drill Stem Test Performed
1952-08-18 Finished Drilling
1952-08-18 Well Mode changed to Drilled and Cased
1952-08-22 Perforation Treatment Performed - Bullet Perforation
1952-08-22 Perforation Treatment Performed - Jet Perforation
1952-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-08-23 Well Began Production
1952-08-23 Well Fluid changed to Crude Oil
1952-08-23 Well Mode changed to Flowing
1958-11-13 Perforation Treatment Performed - Jet Perforation
1958-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-11-14 Perforation Treatment Performed - Jet Perforation
1958-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-12-14 Well Fluid changed to Crude Oil
1958-12-14 Well Mode changed to Flowing
1963-06-02 Perforation Treatment Performed - Cement Squeeze
1963-06-02 Well Fluid changed to Crude Oil
1963-06-02 Well Mode changed to Flowing
1963-12-10 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-12-10 Perforation Treatment Performed - Acid Wash - No Pressure
1963-12-10 Perforation Treatment Performed - Selective Jet Perforations
1965-12-10 Perforation Treatment Performed - Nitrogen Treatment
1965-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-20 Perforation Treatment Performed - Acid Wash - No Pressure
1965-12-20 Perforation Treatment Performed - Nitrogen Treatment
1966-06-30 Perforation Treatment Performed - Cement Squeeze
1966-07-01 Well Fluid changed to Crude Oil
1966-07-01 Well Mode changed to Suspended
1976-08-01 Well Fluid changed to Crude Oil
1976-08-01 Well Mode changed to Flowing
1980-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-29 Well Fluid changed to Crude Oil
1980-10-29 Well Mode changed to Pumping
1981-12-10 Well Fluid changed to Crude Oil
1981-12-10 Well Mode changed to Pumping
1982-09-24 Perforation Treatment Performed - Cement Squeeze
1982-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-10-06 Perforation Treatment Performed - Jet Perforation
1984-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-07 Perforation Treatment Performed - Jet Perforation
1988-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-26 Well Fluid changed to Crude Oil
1990-08-26 Well Mode changed to Suspended
1993-01-06 Perforation Treatment Performed - Jet Perforation
1995-02-11 Well Log Performed
1995-02-20 Well Fluid changed to Crude Oil
1995-02-20 Well Mode changed to Pumping
1997-06-07 Perforation Treatment Performed - Jet Perforation
1997-06-07 Well Log Performed
1998-04-30 Perforation Treatment Performed - Jet Perforation
1998-04-30 Well Log Performed
1998-09-01 Well Fluid changed to Crude Oil
1998-09-01 Well Mode changed to Suspended
1999-07-21 Perforation Treatment Performed - Jet Perforation
1999-07-21 Well Log Performed
1999-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-07-23 Well Fluid changed to Crude Oil
1999-07-23 Well Mode changed to Pumping
2000-03-02 Perforation Treatment Performed - Jet Perforation
2000-03-02 Well Log Performed
2000-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-17 Well Log Performed
2000-07-20 Perforation Treatment Performed - Jet Perforation
2000-07-20 Well Log Performed
2000-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-21 Perforation Treatment Performed - Casing Patch (Over Perfs)
2012-02-01 Well Fluid changed to Crude Oil
2012-02-01 Well Mode changed to Suspended
2014-05-01 Well Fluid changed to Crude Oil
2014-05-01 Well Mode changed to Pumping
2014-05-04 Perforation Treatment Performed - Jet Perforation
2014-05-04 Well Log Performed
2014-05-06 Perforation Treatment Performed - Remedial Casing
2014-05-13 Perforation Treatment Performed - Cement Plug
2014-05-13 Plug Back Performed
2014-05-13 Well Fluid changed to Crude Oil
2014-05-13 Well Mode changed to Abandoned Zone
2014-05-14 Perforation Treatment Performed - Jet Perforation
2014-05-14 Perforation Treatment Performed - Remedial Casing
2014-05-14 Well Log Performed
2014-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-05-15 Perforation Treatment Performed - Cement Plug
2015-01-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-22 Perforation 2179.60 2188.80 13
1963-12-10 Hydra Jet Perforation 1940.40 1941.00 0
1963-12-10 Hydra Jet Perforation 1943.10 1943.10 0
1963-12-10 Selective Jet Perforations 1943.40 1944.00 0
1963-12-10 Selective Jet Perforations 1944.90 1945.50 0
1963-12-10 Selective Jet Perforations 1948.60 1949.50 0
1963-12-10 Selective Jet Perforations 1951.60 1951.60 0
1963-12-10 Acid Wash 1940.40 1951.60 0
1965-12-10 Nitrogen Treatment 1940.40 1951.60 0
1965-12-20 Acid Wash 1940.40 1951.60 0
1965-12-20 Acid Treatment 1940.40 1951.60 0
1952-08-22 Bullet Perforation 2179.60 2188.80 13
1965-12-20 Nitrogen Treatment 1940.40 1951.60 0
1966-06-30 Cement Squeeze 1940.40 1951.60 0
1980-09-16 Acid Treatment 2179.60 2188.80 0
1982-09-24 Cement Squeeze 2179.60 2188.80 0
1982-10-06 Perforation 2187.00 2189.00 13
1982-10-06 Acid Treatment 2187.00 2189.00 0
1984-04-18 Acid Treatment 2187.00 2189.00 0
1988-06-07 Perforation 2185.50 2186.00 13
1988-06-08 Acid Treatment 2185.50 2189.00 0
1993-01-06 Perforation 2174.30 2174.80 16
1952-08-23 Acid Treatment 2179.60 2188.80 0
1997-06-07 Perforation 2165.00 2167.00 16
1998-04-30 Perforation 2160.00 2161.00 16
1999-07-21 Perforation 2137.30 2138.30 20
1999-07-22 Acid Treatment 2137.30 2138.30 0
2000-03-02 Perforation 2043.80 2048.00 13
2000-03-16 Acid Treatment 2043.80 2048.00 0
2000-05-11 Acid Treatment 2043.30 2048.00 0
2000-07-20 Perforation 2044.00 2048.00 13
2000-07-20 Perforation 2035.00 2039.50 13
2000-07-21 Acid Treatment 2035.00 2048.00 0
1958-11-13 Perforation 1951.30 1952.90 13
2000-07-21 Casing Patch 1940.40 1952.70 0
2014-05-04 Perforation 1439.30 1440.30 17
2014-05-04 Perforation 894.00 895.00 17
2014-05-04 Perforation 623.60 624.60 17
2014-05-06 Remedial Casing Cementing 623.60 1440.30 0
2014-05-13 Cement Plug 615.20 2026.80 0
2014-05-14 Perforation 561.00 562.00 17
2014-05-14 Perforation 479.00 480.00 17
2014-05-14 Perforation 446.00 447.00 17
2014-05-14 Perforation 414.00 415.00 17
1958-11-14 Acid Treatment 1951.30 1952.90 0
2014-05-14 Perforation 378.00 379.00 17
2014-05-14 Perforation 356.00 357.00 17
2014-05-14 Perforation 320.00 321.00 17
2014-05-14 Perforation 293.00 294.00 17
2014-05-14 Perforation 259.00 260.00 17
2014-05-14 Perforation 241.00 242.00 17
2014-05-14 Perforation 208.00 209.00 17
2014-05-14 Perforation 197.00 198.00 17
2014-05-14 Perforation 178.00 179.00 17
2014-05-14 Remedial Casing Cementing 178.00 562.00 0
1958-11-14 Perforation 1947.40 1949.80 13
2014-05-15 Cement Plug 169.40 614.80 0
2014-05-15 Packing Device Capped w/Cement 141.00 169.00 0
1958-11-15 Acid Treatment 1947.40 1949.80 0
1958-11-17 Acid Treatment 1947.40 1952.90 0
1963-06-02 Cement Squeeze 1947.40 1952.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 940 0.0 0.0 0.0
1973 7113 0.0 0.0 0.0
1974 7516 0.0 0.0 0.0
1975 4285 0.0 0.0 0.0
1976 6161 0.0 0.0 0.0
1977 6298 0.0 0.0 0.0
1978 4432 0.0 0.0 0.0
1979 8522 0.0 0.0 0.0
1980 7262 0.0 0.0 0.0
1981 7215 0.0 0.0 0.0
1982 6688 0.0 0.0 0.0
1983 4197 0.0 0.0 0.0
1984 4637 0.0 0.0 0.0
1985 6182 0.0 0.0 0.0
1986 5694 0.0 0.0 0.0
1987 4093 0.0 0.0 0.0
1988 8473 0.0 0.0 0.0
1989 8162 0.0 0.0 0.0
1990 5508 0.0 0.0 0.0
1991 24 0.0 0.0 0.0
1995 5018 0.0 0.0 0.0
1996 2924 0.0 0.0 0.0
1997 7233 0.0 0.0 0.0
1998 3620 0.0 0.0 0.0
1999 3371 0.0 0.0 0.0
2000 7420 0.0 0.0 0.0
2001 8758 0.0 0.0 0.0
2002 8700 0.0 0.0 0.0
2003 8716 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 5805 0.0 0.0 0.0
2014 13 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-05-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References