If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465010812022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.953435,"lon":-114.117517,"icon":""}]} |
Location: 02/12-08-046-01W5/2 | |
Location Alias: 02/12-08-46-01 W5M | |
Location Alias 2: 02/12-08-046-01 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 01 | |
Section: 08 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: JOURNEY PEMBINA 12-8-46-1 | |
Operator Name: Journey Energy Inc. | |
License Number: 0185042 | |
License Date: 1996-01-25 | |
License Status: Suspension | |
Spud Date: 1996-02-01 | |
Final Drill Date: 1996-02-05 | |
Well Total Depth: 1020.00 m | |
Surface Hole Latitude: 52.953435 | |
Surface Hole Longitude: -114.117517 |
Date | Event |
---|---|
1996-01-25 | Obtained License |
1996-02-02 | Surface Casing Operation Performed |
1996-02-05 | Finished Drilling |
1996-02-05 | Well Log Performed |
1996-02-05 | Well Mode changed to Drilled and Cased |
1996-02-06 | Production Casing Operation Performed |
1996-02-06 | Rig Released |
1996-02-17 | Well Log Performed |
1996-02-18 | Perforation Treatment Performed - Jet Perforation |
1996-02-18 | Well Log Performed |
1996-02-20 | Perforation Treatment Performed - Fractured |
1997-04-25 | Well Log Performed |
1997-04-27 | Well Log Performed |
2000-06-25 | Perforation Treatment Performed - Jet Perforation |
2000-06-25 | Well Log Performed |
2000-06-25 | Well Mode changed to Drilled and Cased |
2002-04-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-04-05 | Plug Back Performed |
2002-04-05 | Well Mode changed to Abandoned and Whipstocked |
2002-04-18 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-02-18 | Perforation | 974.50 | 976.50 | 17 |
1996-02-20 | Fracture | 974.50 | 976.50 | 0 |
2000-06-25 | Perforation | 960.00 | 970.00 | 17 |
2002-04-05 | Packing Device Capped w/Cement | 910.00 | 973.50 | 0 |
For data sources see[4]