X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465030602000

Well Details

Well ID: 0465030602000
Loading map...
Location: 00/02-06-046-03W5/0
Location Alias: 00/02-06-46-03 W5M
Location Alias 2: 00/02-06-046-03 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 03
Section: 06
County/Municipality: County of Wetaskiwin No. 10
Well Name: JOURNEY CRYSTAL 2-6-46-3
Operator Name: Journey Energy Inc.
License Number: 0105816
License Date: 1984-02-07
License Status: Suspension
Spud Date: 1984-02-09
Final Drill Date: 1984-02-15
Well Total Depth: 1799.50 m
Surface Hole Latitude: 52.933467
Surface Hole Longitude: -114.423749

For data sources see[1][2]

Well History

Date Event
1984-02-07 Obtained License
1984-02-15 Finished Drilling
1984-02-15 Well Mode changed to Drilled and Cased
1984-02-16 Well Log Performed
1984-02-17 Production Casing Operation Performed
1984-03-09 Well Log Performed
1984-03-10 Well Log Performed
1984-03-12 Well Log Performed
1984-03-22 Well Log Performed
1984-11-01 Well Began Injection
1984-11-01 Well Fluid changed to Water
1984-11-01 Well Type changed to Injection
1985-03-11 Perforation Treatment Performed - Jet Perforation
1985-03-13 Perforation Treatment Performed - Chemical Squeeze
1985-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-07 Perforation Treatment Performed - Cement Squeeze
1996-07-09 Perforation Treatment Performed - Jet Perforation
1996-07-09 Well Log Performed
1996-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-01 Well Fluid changed to Water
1999-12-01 Well Mode changed to Suspended
1999-12-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-11 Perforation 1749.00 1761.00 13
1985-03-13 Chemical Squeeze 1749.00 1761.00 0
1985-03-15 Acid Treatment 1749.00 1761.00 0
1996-07-07 Cement Squeeze 1749.00 1761.00 0
1996-07-09 Perforation 1751.00 1753.00 18
1996-07-09 Perforation 1754.50 1757.00 18
1996-07-11 Acid Treatment 1751.00 1757.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References