X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465031902000

Well Details

Well ID: 0465031902000
Loading map...
Location: 00/02-19-046-03W5/0
Location Alias: 00/02-19-46-03 W5M
Location Alias 2: 00/02-19-046-03 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 03
Section: 19
County/Municipality: County of Wetaskiwin No. 10
Well Name: JOURNEY CRYSTAL 2-19-46-3
Operator Name: Journey Energy Inc.
License Number: 0106611
License Date: 1984-03-21
License Status: Suspension
Spud Date: 1984-06-14
Final Drill Date: 1984-06-26
Well Total Depth: 1783.00 m
Surface Hole Latitude: 52.975005
Surface Hole Longitude: -114.422358

For data sources see[1][2]

Well History

Date Event
1984-03-21 Obtained License
1984-06-14 Surface Casing Operation Performed
1984-06-19 Direction Drilling Operation Performed - Straighten Hole
1984-06-19 Well Log Performed
1984-06-26 Finished Drilling
1984-06-27 Well Log Performed
1984-06-28 Lost Circulation Occurred
1984-06-28 Production Casing Operation Performed
1984-06-28 Rig Released
1984-07-21 Well Log Performed
1984-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-23 Perforation Treatment Performed - Chemical Squeeze
1984-07-23 Perforation Treatment Performed - Jet Perforation
1984-07-28 Well Log Performed
1984-11-03 Well Mode changed to Drilled and Cased
1984-11-08 Well Began Injection
1984-11-08 Well Fluid changed to Water
1984-11-08 Well Type changed to Injection
1986-03-19 Perforation Treatment Performed - Fractured
2001-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-26 Plug Back Performed
2001-09-26 Well Fluid changed to Water
2001-09-26 Well Mode changed to Abandoned Zone
2001-09-26 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-06-19 1476.00 Straighten Hole

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-07-23 Perforation 1734.00 1740.00 13
1984-07-23 Acid Treatment 1734.00 1740.00 0
1984-07-23 Chemical Squeeze 1734.00 1740.00 0
1986-03-19 Fracture 1734.00 1740.00 0
2001-09-26 Packing Device Capped w/Cement 1714.00 1722.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-06-28 Lost Circulation 1783.00 1783.00
2001-09-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References