X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465073006000

Well Details

Well ID: 0465073006000
Loading map...
Location: 00/06-30-046-07W5/0
Location Alias: 00/06-30-46-07 W5M
Location Alias 2: 00/06-30-046-07 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 07
Section: 30
County/Municipality: County of Wetaskiwin No. 10
Well Name: BONTERRA ROSE H-1 PEMBINA 6-30-46-7
Operator Name: Bonterra Energy Corp.
License Number: 0029286
License Date: 1965-11-01
License Status: Suspension
Spud Date: 1965-11-16
Final Drill Date: 1965-11-25
Well Total Depth: 1670.30 m
Surface Hole Latitude: 52.995163
Surface Hole Longitude: -115.007894

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-11-01 Obtained License
1965-11-16 Lost Circulation Occurred
1965-11-25 Finished Drilling
1965-11-25 Well Mode changed to Drilled and Cased
1965-11-26 Production Casing Operation Performed
1965-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-30 Perforation Treatment Performed - Fractured
1965-11-30 Perforation Treatment Performed - Jet Perforation
1965-12-05 Well Began Production
1965-12-05 Well Fluid changed to Crude Oil
1965-12-05 Well Mode changed to Flowing
1988-09-06 Well Fluid changed to Crude Oil
1988-09-06 Well Mode changed to Pumping
2004-04-15 Well Fluid changed to Crude Oil
2004-04-15 Well Mode changed to Suspended
2005-09-20 Perforation Treatment Performed - Bridge Plug No Cement Required
2005-10-05 Perforation Treatment Performed - Cement Plug
2005-10-05 Plug Back Performed
2005-10-05 Well Fluid changed to Crude Oil
2005-10-05 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-11-30 Perforation 1646.80 1647.70 13
1965-11-30 Perforation 1648.40 1649.00 13
1965-11-30 Perforation 1649.90 1650.50 13
1965-11-30 Acid Treatment 1646.80 1650.50 0
1965-11-30 Fracture 1646.80 1650.50 0
2005-09-20 Bridge Plug, No Cement 1642.00 1642.50 0
2005-09-20 Bridge Plug, No Cement 1634.00 1634.50 0
2005-10-05 Cement Plug 1186.40 1634.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1821 0.0 0.0 0.0
1968 1622 0.0 0.0 0.0
1969 2506 0.0 0.0 0.0
1970 5829 0.0 0.0 0.0
1971 8087 0.0 0.0 0.0
1972 8488 0.0 0.0 0.0
1973 8280 0.0 0.0 0.0
1974 8015 0.0 0.0 0.0
1975 7320 0.0 0.0 0.0
1976 8399 0.0 0.0 0.0
1977 8016 0.0 0.0 0.0
1978 8016 0.0 0.0 0.0
1979 7968 0.0 0.0 0.0
1980 7416 0.0 0.0 0.0
1981 8567 0.0 0.0 0.0
1982 8352 0.0 0.0 0.0
1983 8052 0.0 0.0 0.0
1984 6864 0.0 0.0 0.0
1985 7584 0.0 0.0 0.0
1986 6684 0.0 0.0 0.0
1987 6875 0.0 0.0 0.0
1988 6936 0.0 0.0 0.0
1989 2592 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-11-16 Lost Circulation 121.90 121.90

For data sources see[6]

References