X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465092004000

Well Details

Well ID: 0465092004000
Loading map...
Location: 00/04-20-046-09W5/0
Location Alias: 00/04-20-46-09 W5M
Location Alias 2: 00/04-20-046-09 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 09
Section: 20
County/Municipality: Brazeau County
Well Name: VEI HZ PEMBINA 4-20-46-9
Operator Name: Vermilion Energy Inc.
License Number: 0463525
License Date: 2014-01-09
License Status: Amended
Spud Date: 2014-11-25
Final Drill Date: 2014-12-07
Well Total Depth: 3683.00 m
Surface Hole Latitude: 52.986463
Surface Hole Longitude: -115.256239

For data sources see[1][2]

Well History

Date Event
2014-01-09 Obtained License
2014-11-27 Surface Casing Operation Performed
2014-11-29 Direction Drilling Operation Performed - Deviate
2014-11-30 Direction Drilling Operation Performed - Horizontal
2014-12-07 Finished Drilling
2014-12-07 Well Log Performed
2014-12-07 Well Mode changed to Drilled and Cased
2014-12-09 Production Casing Operation Performed
2014-12-10 Rig Released
2015-02-02 Perforation Treatment Performed - Open-Hole Completion
2015-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-01 Well Began Production
2015-03-01 Well Fluid changed to Crude Oil
2015-03-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-25 Nabors Drilling Limited 19 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-29 1476.00 Deviate (5 - 79 degrees)
2014-11-30 1919.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-02 Open Hole/Barefoot Completion 3679.00 3683.00 0
2015-02-04 Multi-Stage Fracture 3097.00 3097.10 0
2015-02-04 Multi-Stage Fracture 3025.40 3025.50 0
2015-02-04 Multi-Stage Fracture 2952.10 2952.20 0
2015-02-04 Multi-Stage Fracture 2876.00 2876.10 0
2015-02-04 Multi-Stage Fracture 2815.10 2815.20 0
2015-02-04 Multi-Stage Fracture 2712.70 2712.80 0
2015-02-04 Multi-Stage Fracture 2581.70 2581.80 0
2015-02-04 Multi-Stage Fracture 2451.40 2451.50 0
2015-02-04 Multi-Stage Fracture 2321.60 2321.70 0
2015-02-04 Multi-Stage Fracture 2193.20 2193.30 0
2015-02-03 Multi-Stage Fracture 3639.30 3639.40 0
2015-02-04 Multi-Stage Fracture 2062.30 2062.40 0
2015-02-04 Multi-Stage Fracture 1987.00 1987.10 0
2015-02-03 Multi-Stage Fracture 3589.30 3589.40 0
2015-02-03 Multi-Stage Fracture 3514.70 3514.80 0
2015-02-03 Multi-Stage Fracture 3440.00 3440.10 0
2015-02-03 Multi-Stage Fracture 3366.70 3366.80 0
2015-02-03 Multi-Stage Fracture 3305.80 3305.90 0
2015-02-04 Multi-Stage Fracture 3231.40 3231.50 0
2015-02-04 Multi-Stage Fracture 3155.10 3155.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-02-03 2015-02-04 1,788 3,280 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 5.551 N/A
water Not Available 100 85.0046 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 8.7161 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4488 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0212 N/A
dibromoacetonitrile 3252-43-5 100 0.0212 N/A
non-hazardous ingredients Not Available 100 0.0212 N/A
polyethylene glycol 25322-68-3 100 0.0212 N/A
sodium bromide 7647-15-6 100 0.0212 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1828 N/A
water Not Available 100 0.1828 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0305 N/A
propylene glycol 57-55-6 100 0.0305 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1068 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0462 N/A
SS-7 Trican Surfactant aliphatic alcohol 1111 100 0.0488 N/A
aminofunctional polymer 1111 100 0.0488 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0488 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-02-02 2015-02-04 Groundwater - Non-saline less than or equal to 150m deep 3128

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 6252 0.0 0.0 0.0
2016 8479 0.0 0.0 0.0
2017 8543 0.0 0.0 0.0
2018 8659 0.0 0.0 0.0
2019 8487 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-10 No Incident Encountered 0.00 0.00
2015-02-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References