X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465123307000

Well Details

Well ID: 0465123307000
Loading map...
Location: 00/07-33-046-12W5/0
Location Alias: 00/07-33-46-12 W5M
Location Alias 2: 00/07-33-046-12 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 12
Section: 33
County/Municipality: Yellowhead County
Well Name: WESTBRICK HZ BRAZR 7-33-46-12
Operator Name: Westbrick Energy Ltd.
License Number: 0468843
License Date: 2014-08-05
License Status: Amended
Spud Date: 2014-09-08
Final Drill Date: 2014-09-30
Well Total Depth: 3975.00 m
Surface Hole Latitude: 53.019666
Surface Hole Longitude: -115.684904

For data sources see[1][2]

Well History

Date Event
2014-08-05 Obtained License
2014-09-10 Surface Casing Operation Performed
2014-09-14 Direction Drilling Operation Performed - Deviate
2014-09-18 Direction Drilling Operation Performed - Horizontal
2014-09-18 Well Log Performed
2014-09-20 Intermediate Casing Operation Performed
2014-09-29 Well Log Performed
2014-09-30 Finished Drilling
2014-09-30 Well Log Performed
2014-09-30 Well Mode changed to Drilled and Cased
2014-10-02 Liner Casing Operation Performed
2014-10-03 Rig Released
2014-10-25 Perforation Treatment Performed - Jet Perforation
2014-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-26 Perforation Treatment Performed - Jet Perforation
2014-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-27 Perforation Treatment Performed - Jet Perforation
2014-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-28 Perforation Treatment Performed - Jet Perforation
2014-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-13 Well Log Performed
2014-12-10 Well Began Production
2014-12-10 Well Fluid changed to Crude Oil
2014-12-10 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-09-14 2279.00 Deviate (5 - 79 degrees)
2014-09-18 2854.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-25 Perforation 3914.00 3914.50 24
2014-10-25 Multi-Stage Fracture 3854.00 3854.50 0
2014-10-25 Perforation 3834.00 3834.50 24
2014-10-25 Perforation 3814.00 3814.50 20
2014-10-25 Perforation 3794.00 3794.50 16
2014-10-25 Perforation 3774.00 3774.50 12
2014-10-25 Multi-Stage Fracture 3834.00 3834.50 0
2014-10-25 Multi-Stage Fracture 3814.00 3814.50 0
2014-10-25 Multi-Stage Fracture 3794.00 3794.50 0
2014-10-25 Multi-Stage Fracture 3774.00 3774.50 0
2014-10-25 Perforation 3754.00 3754.50 24
2014-10-25 Perforation 3894.00 3894.50 20
2014-10-25 Perforation 3731.00 3731.50 20
2014-10-25 Perforation 3708.00 3708.50 16
2014-10-25 Perforation 3685.00 3685.50 12
2014-10-25 Multi-Stage Fracture 3754.00 3754.50 0
2014-10-25 Multi-Stage Fracture 3731.00 3731.50 0
2014-10-25 Multi-Stage Fracture 3708.00 3708.50 0
2014-10-25 Multi-Stage Fracture 3685.00 3685.50 0
2014-10-25 Perforation 3665.00 3665.50 24
2014-10-25 Perforation 3645.00 3645.50 20
2014-10-25 Perforation 3625.00 3625.50 16
2014-10-25 Perforation 3874.00 3874.50 16
2014-10-25 Perforation 3605.00 3605.50 12
2014-10-25 Multi-Stage Fracture 3665.00 3665.50 0
2014-10-25 Multi-Stage Fracture 3645.00 3645.50 0
2014-10-25 Multi-Stage Fracture 3625.00 3625.50 0
2014-10-25 Multi-Stage Fracture 3605.00 3605.50 0
2014-10-25 Perforation 3580.00 3580.50 24
2014-10-25 Perforation 3560.00 3560.50 20
2014-10-25 Perforation 3540.00 3540.50 16
2014-10-25 Perforation 3520.00 3520.50 12
2014-10-25 Multi-Stage Fracture 3580.00 3580.50 0
2014-10-25 Perforation 3854.00 3854.50 12
2014-10-25 Multi-Stage Fracture 3560.00 3560.50 0
2014-10-25 Multi-Stage Fracture 3540.00 3540.50 0
2014-10-25 Multi-Stage Fracture 3520.00 3520.50 0
2014-10-26 Perforation 3500.00 3500.50 24
2014-10-26 Perforation 3480.00 3480.50 20
2014-10-26 Perforation 3460.00 3460.50 16
2014-10-26 Perforation 3440.00 3440.50 12
2014-10-26 Multi-Stage Fracture 3500.00 3500.50 0
2014-10-26 Multi-Stage Fracture 3480.00 3480.50 0
2014-10-26 Multi-Stage Fracture 3460.00 3460.50 0
2014-10-25 Multi-Stage Fracture 3947.00 3947.50 0
2014-10-26 Multi-Stage Fracture 3440.00 3440.50 0
2014-10-26 Perforation 3420.00 3420.50 24
2014-10-26 Perforation 3400.00 3400.50 20
2014-10-26 Perforation 3380.00 3380.50 16
2014-10-26 Perforation 3360.00 3360.50 12
2014-10-26 Multi-Stage Fracture 3420.00 3420.50 0
2014-10-26 Multi-Stage Fracture 3400.00 3400.50 0
2014-10-26 Multi-Stage Fracture 3380.00 3380.50 0
2014-10-26 Multi-Stage Fracture 3360.00 3360.50 0
2014-10-27 Perforation 3340.00 3340.50 24
2014-10-25 Multi-Stage Fracture 3934.00 3934.50 0
2014-10-27 Perforation 3315.00 3315.50 20
2014-10-27 Perforation 3290.00 3290.50 16
2014-10-27 Perforation 3265.00 3265.50 12
2014-10-27 Multi-Stage Fracture 3340.00 3340.50 0
2014-10-27 Multi-Stage Fracture 3315.00 3315.50 0
2014-10-27 Multi-Stage Fracture 3290.00 3290.50 0
2014-10-27 Multi-Stage Fracture 3265.00 3265.50 0
2014-10-27 Perforation 3232.00 3232.50 12
2014-10-27 Perforation 3208.00 3208.50 12
2014-10-27 Perforation 3184.00 3184.50 12
2014-10-25 Multi-Stage Fracture 3914.00 3914.50 0
2014-10-27 Multi-Stage Fracture 3232.00 3232.50 0
2014-10-27 Multi-Stage Fracture 3208.00 3208.50 0
2014-10-27 Multi-Stage Fracture 3184.00 3184.50 0
2014-10-27 Perforation 3152.00 3152.50 12
2014-10-27 Perforation 3128.00 3128.50 12
2014-10-27 Perforation 3104.00 3104.50 12
2014-10-27 Multi-Stage Fracture 3152.00 3152.50 0
2014-10-27 Multi-Stage Fracture 3128.00 3128.50 0
2014-10-27 Multi-Stage Fracture 3104.00 3104.50 0
2014-10-28 Perforation 3075.00 3075.50 12
2014-10-25 Multi-Stage Fracture 3894.00 3894.50 0
2014-10-28 Perforation 3045.00 3045.50 12
2014-10-28 Perforation 3015.00 3015.50 12
2014-10-28 Multi-Stage Fracture 3075.00 3075.50 0
2014-10-28 Multi-Stage Fracture 3045.00 3045.50 0
2014-10-28 Multi-Stage Fracture 3015.00 3015.50 0
2014-10-28 Perforation 2970.00 2970.50 12
2014-10-28 Perforation 2940.00 2940.50 12
2014-10-28 Perforation 2910.00 2910.50 12
2014-10-28 Multi-Stage Fracture 2970.00 2970.50 0
2014-10-28 Multi-Stage Fracture 2940.00 2940.50 0
2014-10-25 Multi-Stage Fracture 3874.00 3874.50 0
2014-10-28 Multi-Stage Fracture 2910.00 2910.50 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-25 2014-10-28 2,683 8,341 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 0.7602 N/A
water Not Available 100 47.7287 N/A
PR-6000 30/50 Trican silica crystalline 14808-60-7 100 2.7805 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 6.5292 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 1.3792 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0109 N/A
dibromoacetonitrile 3252-43-5 100 0.0109 N/A
non-hazardous ingredients Not Available 100 0.0109 N/A
polyethylene glycol 25322-68-3 100 0.0109 N/A
sodium bromide 7647-15-6 100 0.0109 N/A
EnCap-HP Trican Breaker ammonium persulfate 7727-54-0 100 0.0117 N/A
cured acrylic resin Not Available 100 0.0117 N/A
silica crystalline 14808-60-7 100 0.0117 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0096 N/A
DRA-90 Trican Buffer non-hazardous ingredients Not Available 100 0.0409 N/A
pH-6 Trican Buffer ethylene glycol 107-21-1 100 0.082 N/A
formic acid 64-18-6 100 0.082 N/A
water Not Available 100 0.082 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1885 N/A
water Not Available 100 0.1885 N/A
AI-7NR Trican Corrosion Inhibitor modified propargyl alcohol Trade Secret 100 0.0028 N/A
propargyl alcohol 107-19-7 100 0.0028 N/A
WXB-77 Trican Crosslinker borate salts 1319-33-1 100 0.1978 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1978 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0697 N/A
propylene glycol 57-55-6 100 0.0697 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0517 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0517 N/A
non-hazardous ingredients Not Available 100 0.0517 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.1177 N/A
IC-2 Trican Iron Control sodium erythorbate 6381-77-7 100 0.0042 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0955 N/A
ASA-60W Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.008 N/A
dipropylene glycol 25265-71-8 100 0.008 N/A
sodium hexyldiphenyl ether sulfonate 147732-60-3 100 0.008 N/A
S-4W Trican Surfactant diethanolamine 111-42-2 100 0.0068 N/A
fatty acid alkanolamide 68603-42-9 100 0.0068 N/A
fatty acid amide Trade Secret 100 0.0068 N/A
glycerin 56-81-5 100 0.0068 N/A
methanol 67-56-1 100 0.0068 N/A
octyl decyl acid phosphate 68186-45-8 100 0.0068 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 72 0.0 0.0 0.0
2015 6702 0.0 0.0 0.0
2016 6380 0.0 0.0 0.0
2017 8342 0.0 0.0 0.0
2018 8705 0.0 0.0 0.0
2019 8726 0.0 0.0 0.0
2020 1920 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-03 No Incident Encountered 0.00 0.00
2014-11-11 No Incident Encountered 0.00 0.00

For data sources see[8]

References