X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465130406003

Well Details

Well ID: 0465130406003
Loading map...
Location: 00/06-04-046-13W5/3
Location Alias: 00/06-04-46-13 W5M
Location Alias 2: 00/06-04-046-13 W5/03
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 13
Section: 04
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 6-4-46-13
Operator Name: Cenovus Energy Inc.
License Number: 0084473
License Date: 1980-07-28
License Status: Abandoned
Spud Date: 1980-09-02
Final Drill Date: 1980-10-15
Well Total Depth: 3066.00 m
Surface Hole Latitude: 52.935812
Surface Hole Longitude: -115.830813

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-28 Obtained License
1980-10-15 Finished Drilling
1980-10-15 Well Mode changed to Drilled and Cased
1980-10-18 Drill Stem Test Performed
1980-10-20 Drill Stem Test Performed
1980-10-23 Production Casing Operation Performed
1980-11-08 Perforation Treatment Performed - Jet Perforation
1980-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-15 Perforation Treatment Performed - Fractured
1994-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-02 Plug Back Performed
1994-02-04 Perforation Treatment Performed - Jet Perforation
1994-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-10 Perforation Treatment Performed - Jet Perforation
1994-02-11 Perforation Treatment Performed - Jet Perforation
1994-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-12 Perforation Treatment Performed - Cement Squeeze
1994-02-15 Perforation Treatment Performed - Jet Perforation
1994-02-17 Perforation Treatment Performed - Fractured
1994-02-23 Perforation Treatment Performed - Jet Perforation
1994-02-25 Perforation Treatment Performed - Fractured
1995-03-03 Perforation Treatment Performed - Cement Squeeze
1995-03-03 Plug Back Performed
1995-03-07 Perforation Treatment Performed - Jet Perforation
1995-03-08 Well Log Performed
1995-03-13 Perforation Treatment Performed - Fractured
1995-04-13 Well Began Production
1995-04-13 Well Fluid changed to Gas
1995-04-13 Well Mode changed to Flowing
2006-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-24 Well Log Performed
2006-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-25 Perforation Treatment Performed - Jet Perforation
2006-07-25 Perforation Treatment Performed - Remedial Casing
2006-07-25 Plug Back Performed
2006-07-25 Well Fluid changed to Gas
2006-07-25 Well Log Performed
2006-07-25 Well Mode changed to Abandoned Zone
2006-08-03 Well Abandoned
2006-08-03 Well Fluid changed to Gas
2006-08-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-08 Perforation 3018.20 3019.80 7
1994-02-10 Packing Device Capped w/Cement 2892.00 2900.00 0
1994-02-10 Perforation 1873.00 1874.00 13
1994-02-11 Perforation 1824.00 1825.00 14
1994-02-12 Acid Treatment 1824.00 1825.00 0
1994-02-12 Cement Squeeze 1824.00 1874.00 0
1994-02-15 Perforation 1861.00 1867.00 18
1994-02-17 Fracture 1861.00 1867.00 0
1994-02-23 Perforation 1829.00 1836.00 13
1994-02-25 Fracture 1829.00 1836.00 0
1995-03-03 Cement Squeeze 1829.00 1867.00 0
1980-11-08 Perforation 3021.00 3022.00 7
1995-03-07 Perforation 2902.00 2905.00 18
1995-03-13 Fracture 2902.00 2905.00 0
2006-07-24 Packing Device Capped w/Cement 2888.00 2896.00 0
2006-07-25 Packing Device Capped w/Cement 1812.00 1820.00 0
2006-07-25 Perforation 610.00 611.00 13
2006-07-25 Remedial Casing Cementing 610.00 611.00 0
1980-11-08 Perforation 3025.50 3029.00 7
1980-11-08 Perforation 3035.00 3040.00 7
1980-11-11 Acid Treatment 3018.20 3040.00 0
1980-11-15 Fracture 3018.20 3040.00 0
1994-02-02 Packing Device Capped w/Cement 2988.00 2996.00 0
1994-02-04 Perforation 2902.00 2905.00 18
1994-02-10 Acid Treatment 2902.00 2905.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4927 0.0 0.0 0.0
1996 5562 0.0 0.0 0.0
1997 4137 0.0 0.0 0.0
1998 4525 0.0 0.0 0.0
1999 8116 0.0 0.0 0.0
2000 6280 0.0 0.0 0.0
2001 5557 0.0 0.0 0.0
2002 264 0.0 0.0 0.0
2003 3215 0.0 0.0 0.0
2004 4317 0.0 0.0 0.0

For data sources see[5]

References