X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465131907000

Well Details

Well ID: 0465131907000
Loading map...
Location: 00/07-19-046-13W5/0
Location Alias: 00/07-19-46-13 W5M
Location Alias 2: 00/07-19-046-13 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 13
Section: 19
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 7-19-46-13
Operator Name: Cenovus Energy Inc.
License Number: 0203362
License Date: 1997-07-11
License Status: Issued
Spud Date: 1997-07-21
Final Drill Date: 1997-08-13
Well Total Depth: 2957.00 m
Surface Hole Latitude: 52.978441
Surface Hole Longitude: -115.869332

For data sources see[1][2]

Well History

Date Event
1997-07-11 Obtained License
1997-07-21 Well Log Performed
1997-07-25 Surface Casing Operation Performed
1997-08-13 Finished Drilling
1997-08-13 Well Log Performed
1997-08-13 Well Mode changed to Drilled and Cased
1997-08-14 Drill Stem Test Performed
1997-08-18 Rig Released
1997-08-26 Well Log Performed
1997-08-27 Perforation Treatment Performed - Fractured
1997-08-27 Perforation Treatment Performed - Jet Perforation
1997-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-31 Well Log Performed
1997-09-01 Well Log Performed
1997-09-02 Perforation Treatment Performed - Jet Perforation
1997-09-04 Perforation Treatment Performed - Fractured
1997-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-13 Perforation Treatment Performed - Fractured
1997-10-03 Well Began Production
1997-10-03 Well Fluid changed to Gas
1997-10-03 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-27 Perforation 2914.00 2919.00 20
1997-08-27 Fracture 2914.00 2919.00 0
1997-08-30 Packing Device Capped w/Cement 2902.00 2910.00 0
1997-09-02 Perforation 2882.00 2886.00 20
1997-09-04 Fracture 2882.00 2886.00 0
1997-09-06 Acid Treatment 2882.00 2886.00 0
1997-09-09 Acid Treatment 2882.00 2886.00 0
1997-09-13 Fracture 2882.00 2886.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1938 0.0 0.0 0.0
1998 4091 0.0 0.0 0.0
1999 6061 0.0 0.0 0.0
2000 5582 0.0 0.0 0.0
2001 4688 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8440 0.0 0.0 0.0
2004 8658 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 7967 0.0 0.0 0.0
2008 8520 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8548 0.0 0.0 0.0
2012 8344 0.0 0.0 0.0
2013 2159 0.0 0.0 0.0
2014 4461 0.0 0.0 0.0
2015 8025 0.0 0.0 0.0
2016 8485 0.0 0.0 0.0
2017 8628 0.0 0.0 0.0
2018 8177 0.0 0.0 0.0
2019 7948 0.0 0.0 0.0
2020 1763 0.0 0.0 0.0

For data sources see[5]

References