X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465152509003

Well Details

Well ID: 0465152509003
Loading map...
Location: 00/09-25-046-15W5/3
Location Alias: 00/09-25-46-15 W5M
Location Alias 2: 00/09-25-046-15 W5/03
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 15
Section: 25
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 9-25-46-15
Operator Name: Cenovus Energy Inc.
License Number: 0184443
License Date: 1996-01-11
License Status: Abandoned
Spud Date: 1996-01-19
Final Drill Date: 1996-03-19
Well Total Depth: 3401.00 m
Surface Hole Latitude: 52.999592
Surface Hole Longitude: -116.038500

For data sources see[1][2]

Well History

Date Event
1996-01-11 Obtained License
1996-01-19 Well Log Performed
1996-01-27 Surface Casing Operation Performed
1996-03-01 Direction Drilling Operation Performed - Horizontal
1996-03-19 Finished Drilling
1996-03-19 Well Log Performed
1996-03-19 Well Mode changed to Drilled and Cased
1996-03-20 Well Log Performed
1996-03-23 Production Casing Operation Performed
1996-03-23 Rig Released
1996-04-01 Well Log Performed
1996-04-03 Perforation Treatment Performed - Jet Perforation
1996-04-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-12 Well Log Performed
1996-04-13 Perforation Treatment Performed - Fractured
1996-04-13 Perforation Treatment Performed - Jet Perforation
1996-04-14 Plug Back Performed
1996-06-10 Well Log Performed
1996-06-16 Perforation Treatment Performed - Fractured
1996-06-24 Well Log Performed
1996-06-25 Perforation Treatment Performed - Jet Perforation
1996-06-30 Perforation Treatment Performed - Fractured
1996-07-02 Perforation Treatment Performed - Fractured
2001-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-19 Plug Back Performed
2001-09-20 Perforation Treatment Performed - Jet Perforation
2011-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-15 Plug Back Performed
2011-02-15 Well Mode changed to Abandoned Zone
2012-10-20 Well Abandoned
2012-10-20 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-03-01 3010.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-04-03 Perforation 3250.00 3400.00 20
2001-09-20 Perforation 671.00 675.00 17
2011-02-15 Packing Device Capped w/Cement 658.20 666.20 0
1996-04-12 Packing Device Capped w/Cement 3160.00 3168.00 0
1996-04-13 Perforation 3093.50 3097.50 20
1996-04-13 Fracture 3093.50 3097.50 0
1996-06-16 Fracture 3093.50 3097.50 0
1996-06-25 Perforation 3093.50 3097.50 20
1996-06-30 Fracture 3093.50 3097.50 0
1996-07-02 Fracture 3093.50 3097.50 0
2001-09-19 Packing Device Capped w/Cement 3034.00 3042.00 0

For data sources see[5]



References