X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465153507000

Well Details

Well ID: 0465153507000
Loading map...
Location: 00/07-35-046-15W5/0
Location Alias: 00/07-35-46-15 W5M
Location Alias 2: 00/07-35-046-15 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 15
Section: 35
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 7-35-46-15
Operator Name: Cenovus Energy Inc.
License Number: 0178742
License Date: 1995-06-21
License Status: Issued
Spud Date: 1995-07-28
Final Drill Date: 1995-09-04
Well Total Depth: 3265.00 m
Surface Hole Latitude: 53.008817
Surface Hole Longitude: -116.066282

For data sources see[1][2]

Well History

Date Event
1995-06-21 Obtained License
1995-07-28 Well Log Performed
1995-07-29 Lost Circulation Occurred
1995-07-31 Surface Casing Operation Performed
1995-08-05 Lost Circulation Occurred
1995-09-04 Finished Drilling
1995-09-04 Well Mode changed to Drilled and Cased
1995-09-05 Well Log Performed
1995-09-07 Production Casing Operation Performed
1995-09-08 Lost Circulation Occurred
1995-09-08 Rig Released
1995-09-16 Well Log Performed
1995-09-18 Perforation Treatment Performed - Jet Perforation
1995-09-18 Well Log Performed
1995-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-12 Well Log Performed
1995-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-15 Perforation Treatment Performed - Cement Squeeze
1995-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-19 Well Log Performed
1995-10-21 Perforation Treatment Performed - Fractured
1995-10-21 Perforation Treatment Performed - Jet Perforation
1995-10-21 Well Log Performed
1995-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-25 Perforation Treatment Performed - Jet Perforation
1995-10-25 Well Log Performed
1995-11-02 Well Log Performed
1995-11-05 Perforation Treatment Performed - Fractured
1995-12-18 Well Began Production
1995-12-18 Well Fluid changed to Gas
1995-12-18 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-18 Perforation 3235.00 3240.00 20
1995-11-05 Fracture 3010.00 3014.00 0
1995-09-21 Acid Treatment 3235.00 3240.00 0
1995-10-13 Acid Treatment 3235.00 3240.00 0
1995-10-15 Cement Squeeze 3235.00 3240.00 0
1995-10-19 Packing Device Capped w/Cement 3217.00 3225.00 0
1995-10-21 Perforation 3043.50 3056.00 20
1995-10-21 Fracture 3043.50 3056.00 0
1995-10-25 Packing Device Capped w/Cement 3030.00 3039.00 0
1995-10-25 Perforation 3010.00 3014.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 8530 0.0 0.0 0.0
1997 8272 0.0 0.0 0.0
1998 6819 0.0 0.0 0.0
1999 5264 0.0 0.0 0.0
2000 6672 0.0 0.0 0.0
2001 6683 0.0 0.0 0.0
2002 8711 0.0 0.0 0.0
2003 8187 0.0 0.0 0.0
2004 8679 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8063 0.0 0.0 0.0
2008 8591 0.0 0.0 0.0
2009 8520 0.0 0.0 0.0
2010 7291 0.0 0.0 0.0
2011 8397 0.0 0.0 0.0
2012 8310 0.0 0.0 0.0
2013 8414 0.0 0.0 0.0
2014 8637 0.0 0.0 0.0
2015 8217 0.0 0.0 0.0
2016 8609 0.0 0.0 0.0
2017 8688 0.0 0.0 0.0
2018 8624 0.0 0.0 0.0
2019 8758 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-07-29 Lost Circulation 173.00 333.00
1995-08-05 Lost Circulation 1310.00 1310.00
1995-09-08 Lost Circulation 3265.00 3265.00

For data sources see[6]

References