X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465162009000

Well Details

Well ID: 0465162009000
Loading map...
Location: 00/09-20-046-16W5/0
Location Alias: 00/09-20-46-16 W5M
Location Alias 2: 00/09-20-046-16 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 16
Section: 20
County/Municipality: Yellowhead County
Well Name: FAIRBORNE COLUMBIA 16-20-46-16
Operator Name: Tourmaline Oil Corp.
License Number: 0078534
License Date: 1979-10-10
License Status: Suspension
Spud Date: 1979-10-16
Final Drill Date: 1980-02-08
Well Total Depth: 4342.50 m
Surface Hole Latitude: 52.984647
Surface Hole Longitude: -116.281426

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-10 Obtained License
1979-10-16 Direction Drilling Operation Performed - 98
1980-02-08 Finished Drilling
1980-02-08 Rig Released
1980-02-08 Well Mode changed to Drilled and Cased
1980-02-10 Liner Casing Operation Performed
1980-07-22 Perforation Treatment Performed - Jet Perforation
1981-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-04-05 Perforation Treatment Performed - Jet Perforation
1983-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-23 Perforation Treatment Performed - Fractured
1983-09-16 Well Began Production
1983-09-16 Well Fluid changed to Gas
1983-09-16 Well Mode changed to Flowing
1983-11-08 Perforation Treatment Performed - Chemical Squeeze
1984-01-02 Well Log Performed
1984-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-12 Perforation Treatment Performed - Fractured
1994-01-01 Well Fluid changed to Gas
1994-01-01 Well Mode changed to Suspended
1994-09-01 Well Fluid changed to Gas
1994-09-01 Well Mode changed to Flowing
2004-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-01 Plug Back Performed
2004-10-01 Well Fluid changed to Gas
2004-10-01 Well Mode changed to Abandoned and Whipstocked
2004-10-02 Well Log Performed
2004-11-10 Perforation Treatment Performed - Bridge Plug No Cement Required
2004-11-10 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1979-10-16 1494.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-22 Perforation 4205.00 4210.00 13
1984-02-13 Acid Treatment 4205.00 4210.00 0
1984-06-12 Fracture 4205.00 4210.00 0
2004-10-01 Packing Device Capped w/Cement 4039.80 4048.20 0
2004-11-10 Bridge Plug, No Cement 3959.30 3959.70 0
1981-08-24 Packing Device Capped w/Cement 4143.50 4148.50 0
1981-09-08 Packing Device Capped w/Cement 4111.80 4116.00 0
1983-04-05 Perforation 4205.00 4210.00 13
1983-04-18 Acid Treatment 4205.00 4210.00 0
1983-04-19 Acid Treatment 4205.00 4210.00 0
1983-04-22 Acid Treatment 4205.00 4210.00 0
1983-04-23 Fracture 4205.00 4210.00 0
1983-11-08 Chemical Squeeze 4205.00 4210.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 1244 0.0 0.0 0.0
1984 5911 0.0 0.0 0.0
1985 6652 0.0 0.0 0.0
1986 2122 0.0 0.0 0.0
1987 8042 0.0 0.0 0.0
1988 6293 0.0 0.0 0.0
1989 5236 0.0 0.0 0.0
1990 708 0.0 0.0 0.0
1994 528 0.0 0.0 0.0
1996 166 0.0 0.0 0.0
1998 458 0.0 0.0 0.0
1999 6594 0.0 0.0 0.0
2000 4103 0.0 0.0 0.0
2001 2672 0.0 0.0 0.0
2002 6677 0.0 0.0 0.0
2003 7154 0.0 0.0 0.0
2004 4225 0.0 0.0 0.0

For data sources see[6]

References