If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465162009000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.984647,"lon":-116.281426,"icon":""}]} |
Location: 00/09-20-046-16W5/0 | |
Location Alias: 00/09-20-46-16 W5M | |
Location Alias 2: 00/09-20-046-16 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 16 | |
Section: 20 | |
County/Municipality: Yellowhead County | |
Well Name: FAIRBORNE COLUMBIA 16-20-46-16 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0078534 | |
License Date: 1979-10-10 | |
License Status: Suspension | |
Spud Date: 1979-10-16 | |
Final Drill Date: 1980-02-08 | |
Well Total Depth: 4342.50 m | |
Surface Hole Latitude: 52.984647 | |
Surface Hole Longitude: -116.281426 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-10-10 | Obtained License |
1979-10-16 | Direction Drilling Operation Performed - 98 |
1980-02-08 | Finished Drilling |
1980-02-08 | Rig Released |
1980-02-08 | Well Mode changed to Drilled and Cased |
1980-02-10 | Liner Casing Operation Performed |
1980-07-22 | Perforation Treatment Performed - Jet Perforation |
1981-08-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-04-05 | Perforation Treatment Performed - Jet Perforation |
1983-04-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-04-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-04-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-04-23 | Perforation Treatment Performed - Fractured |
1983-09-16 | Well Began Production |
1983-09-16 | Well Fluid changed to Gas |
1983-09-16 | Well Mode changed to Flowing |
1983-11-08 | Perforation Treatment Performed - Chemical Squeeze |
1984-01-02 | Well Log Performed |
1984-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-06-12 | Perforation Treatment Performed - Fractured |
1994-01-01 | Well Fluid changed to Gas |
1994-01-01 | Well Mode changed to Suspended |
1994-09-01 | Well Fluid changed to Gas |
1994-09-01 | Well Mode changed to Flowing |
2004-10-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-10-01 | Plug Back Performed |
2004-10-01 | Well Fluid changed to Gas |
2004-10-01 | Well Mode changed to Abandoned and Whipstocked |
2004-10-02 | Well Log Performed |
2004-11-10 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2004-11-10 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1979-10-16 | 1494.00 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-07-22 | Perforation | 4205.00 | 4210.00 | 13 |
1984-02-13 | Acid Treatment | 4205.00 | 4210.00 | 0 |
1984-06-12 | Fracture | 4205.00 | 4210.00 | 0 |
2004-10-01 | Packing Device Capped w/Cement | 4039.80 | 4048.20 | 0 |
2004-11-10 | Bridge Plug, No Cement | 3959.30 | 3959.70 | 0 |
1981-08-24 | Packing Device Capped w/Cement | 4143.50 | 4148.50 | 0 |
1981-09-08 | Packing Device Capped w/Cement | 4111.80 | 4116.00 | 0 |
1983-04-05 | Perforation | 4205.00 | 4210.00 | 13 |
1983-04-18 | Acid Treatment | 4205.00 | 4210.00 | 0 |
1983-04-19 | Acid Treatment | 4205.00 | 4210.00 | 0 |
1983-04-22 | Acid Treatment | 4205.00 | 4210.00 | 0 |
1983-04-23 | Fracture | 4205.00 | 4210.00 | 0 |
1983-11-08 | Chemical Squeeze | 4205.00 | 4210.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 1244 | 0.0 | 0.0 | 0.0 |
1984 | 5911 | 0.0 | 0.0 | 0.0 |
1985 | 6652 | 0.0 | 0.0 | 0.0 |
1986 | 2122 | 0.0 | 0.0 | 0.0 |
1987 | 8042 | 0.0 | 0.0 | 0.0 |
1988 | 6293 | 0.0 | 0.0 | 0.0 |
1989 | 5236 | 0.0 | 0.0 | 0.0 |
1990 | 708 | 0.0 | 0.0 | 0.0 |
1994 | 528 | 0.0 | 0.0 | 0.0 |
1996 | 166 | 0.0 | 0.0 | 0.0 |
1998 | 458 | 0.0 | 0.0 | 0.0 |
1999 | 6594 | 0.0 | 0.0 | 0.0 |
2000 | 4103 | 0.0 | 0.0 | 0.0 |
2001 | 2672 | 0.0 | 0.0 | 0.0 |
2002 | 6677 | 0.0 | 0.0 | 0.0 |
2003 | 7154 | 0.0 | 0.0 | 0.0 |
2004 | 4225 | 0.0 | 0.0 | 0.0 |
For data sources see[6]