0465171304000

Well Details

Well ID: 0465171304000
Loading map...
Location: 00/04-13-046-17W5/0
Location Alias: 00/04-13-46-17 W5M
Location Alias 2: 00/04-13-046-17 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 17
Section: 13
County/Municipality: Yellowhead County
Well Name: Canlin HANLAN 4-13-46-17
Operator Name: Canlin Energy Corporation
License Number: 0154946
License Date: 1992-12-03
License Status: Suspension
Spud Date: 1992-12-10
Final Drill Date: 1993-05-02
Well Total Depth: 4792.00 m
Surface Hole Latitude: 52.962547
Surface Hole Longitude: -116.342066

For data sources see[1][2]

Well History

Date Event
1992-12-03 Obtained License
1992-12-17 Surface Casing Operation Performed
1992-12-25 Lost Circulation Occurred
1993-01-02 Lost Circulation Occurred
1993-01-28 Lost Circulation Occurred
1993-02-02 Lost Circulation Occurred
1993-02-16 Lost Circulation Occurred
1993-02-22 Lost Circulation Occurred
1993-03-01 Intermediate Casing Operation Performed
1993-04-04 Well Log Performed
1993-04-11 Kick Occurred
1993-04-16 Well Log Performed
1993-04-18 Well Log Performed
1993-04-21 Liner Casing Operation Performed
1993-04-21 Lost Circulation Occurred
1993-05-02 Finished Drilling
1993-05-02 Well Mode changed to Drilled and Cased
1993-05-03 Well Log Performed
1993-05-04 Well Log Performed
1993-05-06 Liner Casing Operation Performed
1993-05-10 Rig Released
1993-09-25 Well Log Performed
1993-10-06 Perforation Treatment Performed - Jet Perforation
1993-10-07 Well Log Performed
1993-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-03 Well Log Performed
1994-04-01 Well Began Production
1994-04-01 Well Fluid changed to Gas
1994-04-01 Well Mode changed to Flowing
1997-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-27 Plug Back Performed
1997-09-27 Well Fluid changed to Gas
1997-09-27 Well Mode changed to Abandoned and Whipstocked
2003-12-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-10-06 Perforation 4733.80 4747.00 13
1993-10-09 Acid Treatment 4733.80 4747.00 0
1993-10-12 Acid Treatment 4733.80 4747.00 0
1997-09-27 Packing Device Capped w/Cement 4606.00 4614.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 5802 0.0 0.0 0.0
1995 702 0.0 0.0 0.0
1996 7866 0.0 0.0 0.0
1997 5172 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1992-12-25 Lost Circulation 1313.00 1609.00
1993-01-02 Lost Circulation 1882.00 1892.00
1993-01-28 Lost Circulation 3062.00 3062.00
1993-02-02 Lost Circulation 3287.00 3287.00
1993-02-16 Lost Circulation 3556.00 3556.00
1993-02-22 Lost Circulation 3556.00 3556.00
1993-04-11 Kick 4592.00 4592.00
1993-04-21 Lost Circulation 4708.00 4708.00

For data sources see[6]

References