X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465213606003

Well Details

Well ID: 0465213606003
Loading map...
Location: 00/06-36-046-21W5/3
Location Alias: 00/06-36-46-21 W5M
Location Alias 2: 00/06-36-046-21 W5/03
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 21
Section: 36
County/Municipality: Yellowhead County
Well Name: Canlin MOUNTAIN 6-36-46-21
Operator Name: Canlin Energy Corporation
License Number: 0232105
License Date: 2000-01-17
License Status: Suspension
Spud Date: 2000-01-21
Final Drill Date: 2000-03-16
Well Total Depth: 3452.00 m
Surface Hole Latitude: 53.007165
Surface Hole Longitude: -116.920714

For data sources see[1][2]

Well History

Date Event
2000-01-17 Obtained License
2000-01-27 Surface Casing Operation Performed
2000-01-29 Direction Drilling Operation Performed - Deviate
2000-02-24 Well Log Performed
2000-02-29 Well Log Performed
2000-03-10 Intermediate Casing Operation Performed
2000-03-16 Finished Drilling
2000-03-16 Well Log Performed
2000-03-16 Well Mode changed to Drilled and Cased
2000-03-17 Well Log Performed
2000-03-18 Well Log Performed
2000-03-20 Liner Casing Operation Performed
2000-03-23 Rig Released
2000-04-13 Perforation Treatment Performed - Jet Perforation
2000-04-13 Well Log Performed
2000-04-21 Well Log Performed
2000-04-22 Perforation Treatment Performed - Cement Squeeze
2000-04-28 Well Log Performed
2000-04-29 Perforation Treatment Performed - Jet Perforation
2000-05-01 Perforation Treatment Performed - Fractured
2000-05-03 Well Log Performed
2000-05-05 Well Log Performed
2000-05-06 Perforation Treatment Performed - Jet Perforation
2000-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-05-16 Well Log Performed
2000-05-18 Perforation Treatment Performed - Jet Perforation
2000-05-18 Well Log Performed
2000-05-19 Perforation Treatment Performed - Chemical Squeeze
2000-05-21 Perforation Treatment Performed - Fractured
2000-05-27 Well Log Performed
2000-08-02 Well Structure changed to Commingled
2008-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-28 Plug Back Performed
2008-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-07 Plug Back Performed
2008-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-29 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-01-29 621.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-04-13 Perforation 3390.00 3412.00 17
2000-05-18 Perforation 3131.00 3137.00 17
2000-05-19 Chemical Squeeze 3122.00 3137.00 0
2000-05-21 Fracture 3122.00 3137.00 0
2008-02-28 Packing Device Capped w/Cement 3338.00 3346.00 0
2008-03-07 Packing Device Capped w/Cement 3307.20 3315.20 0
2008-03-29 Packing Device Capped w/Cement 3179.00 3191.00 0
2000-04-13 Perforation 3372.00 3377.00 17
2000-04-22 Cement Squeeze 3372.00 3412.00 0
2000-04-29 Perforation 3372.00 3377.00 20
2000-04-29 Perforation 3390.00 3412.00 20
2000-05-01 Fracture 3372.00 3412.00 0
2000-05-06 Perforation 3322.00 3337.00 20
2000-05-08 Acid Treatment 3322.00 3337.00 0
2000-05-18 Perforation 3122.00 3128.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 87 0.0 0.0 0.0

For data sources see[6]

References