X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474270602000

Well Details

Well ID: 0474270602000
Loading map...
Location: 00/02-06-047-27W4/0
Location Alias: 00/02-06-47-27 W4M
Location Alias 2: 00/02-06-047-27 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 06
County/Municipality: County of Wetaskiwin No. 10
Well Name: ESSO B1 BGLEN 2-6MU-47-27
Operator Name: Imperial Oil Resources Limited
License Number: 0005204
License Date: 1952-08-27
License Status: Suspension
Spud Date: 1952-08-27
Final Drill Date: 1952-10-16
Well Total Depth: 2206.00 m
Surface Hole Latitude: 53.019752
Surface Hole Longitude: -113.936047

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-08-27 Obtained License
1952-10-05 Drill Stem Test Performed
1952-10-09 Liner Casing Operation Performed
1952-10-16 Drill Stem Test Performed
1952-10-16 Finished Drilling
1952-10-16 Well Mode changed to Drilled and Cased
1952-10-19 Perforation Treatment Performed - Bullet Perforation
1952-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-10-21 Well Began Production
1952-10-21 Well Fluid changed to Crude Oil
1952-10-21 Well Mode changed to Flowing
1958-10-23 Perforation Treatment Performed - Jet Perforation
1958-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-11-08 Well Fluid changed to Crude Oil
1958-11-08 Well Mode changed to Flowing
1968-05-12 Perforation Treatment Performed - Cement Squeeze
1968-05-18 Well Fluid changed to Crude Oil
1968-05-18 Well Mode changed to Flowing
1973-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-07-12 Perforation Treatment Performed - Cement Squeeze
1983-07-14 Perforation Treatment Performed - Open-Hole Completion
1983-07-15 Perforation Treatment Performed - Jet Perforation
1983-07-15 Well Log Performed
1983-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-18 Well Fluid changed to Crude Oil
1985-10-18 Well Mode changed to Pumping
1986-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-09 Well Log Performed
1990-07-10 Perforation Treatment Performed - Jet Perforation
1990-07-10 Well Log Performed
1990-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-14 Perforation Treatment Performed - Jet Perforation
1992-06-14 Well Log Performed
1992-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-16 Perforation Treatment Performed - Jet Perforation
1992-06-16 Well Log Performed
1993-01-01 Well Fluid changed to Crude Oil
1993-01-01 Well Mode changed to Suspended
1995-02-01 Well Fluid changed to Crude Oil
1995-02-01 Well Mode changed to Pumping
1996-11-11 Perforation Treatment Performed - Jet Perforation
1996-11-11 Well Log Performed
1997-08-01 Well Fluid changed to Crude Oil
1997-08-01 Well Mode changed to Suspended
2001-04-04 Well Log Performed
2001-04-25 Perforation Treatment Performed - Jet Perforation
2001-04-25 Well Log Performed
2001-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-28 Well Fluid changed to Gas
2001-05-28 Well Mode changed to Flowing
2001-08-01 Perforation Treatment Performed - Jet Perforation
2010-06-01 Well Fluid changed to Gas
2010-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-10-19 Bullet Perforation 2183.90 2192.40 20
1983-07-18 Acid Treatment 2192.20 2193.20 0
1986-11-07 Acid Treatment 2192.20 2206.00 0
1990-07-10 Perforation 2188.50 2189.20 20
1990-07-11 Acid Treatment 2188.50 2189.20 0
1992-06-14 Perforation 2181.60 2182.60 20
1992-06-16 Perforation 2178.60 2179.20 20
1992-06-16 Acid Treatment 2178.60 2179.20 0
1996-11-11 Perforation 2171.60 2172.30 17
2001-04-25 Perforation 2036.50 2041.50 13
2001-04-25 Perforation 2032.50 2033.50 13
1952-10-20 Acid Treatment 2183.90 2192.40 0
2001-04-27 Acid Treatment 2032.50 2041.50 0
2001-08-01 Perforation 2032.50 2041.50 13
1958-10-23 Perforation 1944.90 1946.50 13
1958-10-24 Acid Treatment 1944.90 1946.50 0
1968-05-12 Cement Squeeze 1944.90 1946.50 0
1973-05-16 Acid Treatment 2183.90 2192.40 0
1983-07-12 Cement Squeeze 2183.90 2192.40 0
1983-07-14 Open Hole/Barefoot Completion 2205.80 2206.00 0
1983-07-15 Perforation 2192.20 2193.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1967 3972 0.0 0.0 0.0
1968 5822 0.0 0.0 0.0
1969 7423 0.0 0.0 0.0
1970 5425 0.0 0.0 0.0
1971 5587 0.0 0.0 0.0
1972 6292 0.0 0.0 0.0
1973 6532 0.0 0.0 0.0
1974 5894 0.0 0.0 0.0
1975 2814 0.0 0.0 0.0
1976 2941 0.0 0.0 0.0
1977 2990 0.0 0.0 0.0
1978 2885 0.0 0.0 0.0
1979 6222 0.0 0.0 0.0
1980 6373 0.0 0.0 0.0
1981 6527 0.0 0.0 0.0
1982 6150 0.0 0.0 0.0
1983 6011 0.0 0.0 0.0
1984 8604 0.0 0.0 0.0
1985 8203 0.0 0.0 0.0
1986 5304 0.0 0.0 0.0
1987 6930 0.0 0.0 0.0
1988 8675 0.0 0.0 0.0
1989 8393 0.0 0.0 0.0
1990 7832 0.0 0.0 0.0
1991 8157 0.0 0.0 0.0
1992 4014 0.0 0.0 0.0
1995 3024 0.0 0.0 0.0
1996 8640 0.0 0.0 0.0
1997 2880 0.0 0.0 0.0
2001 4322 0.0 0.0 0.0
2002 8649 0.0 0.0 0.0
2003 8726 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 5831 0.0 0.0 0.0
2007 5088 0.0 0.0 0.0
2008 3407 0.0 0.0 0.0

For data sources see[5]

References