X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475120101000

Well Details

Well ID: 0475120101000
Loading map...
Location: 00/01-01-047-12W5/0
Location Alias: 00/01-01-47-12 W5M
Location Alias 2: 00/01-01-047-12 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 12
Section: 01
County/Municipality: Yellowhead County
Well Name: DAYLIGHT HZ BRAZR 1-1-47-12
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0440342
License Date: 2011-12-05
License Status: Issued
Spud Date: 2011-12-29
Final Drill Date: 2012-01-10
Well Total Depth: 3450.00 m
Surface Hole Latitude: 53.019824
Surface Hole Longitude: -115.634779

For data sources see[1][2]

Well History

Date Event
2011-12-05 Obtained License
2011-12-29 Well Log Performed
2012-01-01 Surface Casing Operation Performed
2012-01-04 Direction Drilling Operation Performed - Horizontal
2012-01-06 Well Log Performed
2012-01-10 Finished Drilling
2012-01-10 Well Log Performed
2012-01-10 Well Mode changed to Drilled and Cased
2012-01-13 Intermediate Casing Operation Performed
2012-01-13 Liner Casing Operation Performed
2012-01-14 Rig Released
2012-01-17 Well Log Performed
2012-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-27 Perforation Treatment Performed - Open-Hole Completion
2012-01-27 Well Began Production
2012-01-27 Well Fluid changed to Crude Oil
2012-01-27 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-04 1700.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-27 Open Hole/Barefoot Completion 3445.00 3450.00 0
2012-01-27 Multi-Stage Fracture 2833.00 2833.10 0
2012-01-27 Multi-Stage Fracture 2759.40 2759.50 0
2012-01-27 Multi-Stage Fracture 2699.70 2699.80 0
2012-01-27 Multi-Stage Fracture 2627.30 2627.40 0
2012-01-27 Multi-Stage Fracture 2556.80 2556.90 0
2012-01-27 Multi-Stage Fracture 2471.50 2471.60 0
2012-01-27 Multi-Stage Fracture 2412.70 2412.80 0
2012-01-27 Multi-Stage Fracture 2340.60 2340.70 0
2012-01-27 Multi-Stage Fracture 2267.40 2267.50 0
2012-01-27 Multi-Stage Fracture 3420.10 3420.20 0
2012-01-27 Multi-Stage Fracture 3342.90 3343.00 0
2012-01-27 Multi-Stage Fracture 3271.20 3271.30 0
2012-01-27 Multi-Stage Fracture 3196.80 3196.90 0
2012-01-27 Multi-Stage Fracture 3124.80 3124.90 0
2012-01-27 Multi-Stage Fracture 3052.10 3052.20 0
2012-01-27 Multi-Stage Fracture 2992.50 2992.60 0
2012-01-27 Multi-Stage Fracture 2906.10 2906.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6540 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 7919 0.0 0.0 0.0
2015 6438 0.0 0.0 0.0
2016 8390 0.0 0.0 0.0
2017 8621 0.0 0.0 0.0
2018 8283 0.0 0.0 0.0
2019 7130 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

References