If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475120204000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.01996,"lon":-115.634789,"icon":""}]} |
Location: 00/04-02-047-12W5/0 | |
Location Alias: 00/04-02-47-12 W5M | |
Location Alias 2: 00/04-02-047-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 12 | |
Section: 02 | |
County/Municipality: Yellowhead County | |
Well Name: SDEL HZ BRAZR 4-2-47-12 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0444866 | |
License Date: 2012-03-12 | |
License Status: Amended | |
Spud Date: 2012-03-18 | |
Final Drill Date: 2012-03-29 | |
Well Total Depth: 3430.00 m | |
Surface Hole Latitude: 53.019960 | |
Surface Hole Longitude: -115.634789 |
Date | Event |
---|---|
2012-03-12 | Obtained License |
2012-03-19 | Surface Casing Operation Performed |
2012-03-20 | Well Log Performed |
2012-03-22 | Direction Drilling Operation Performed - Deviate |
2012-03-23 | Direction Drilling Operation Performed - Horizontal |
2012-03-24 | Well Log Performed |
2012-03-29 | Finished Drilling |
2012-03-29 | Well Log Performed |
2012-03-29 | Well Mode changed to Drilled and Cased |
2012-03-31 | Production Casing Operation Performed |
2012-03-31 | Rig Released |
2012-05-25 | Well Log Performed |
2012-06-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-03 | Perforation Treatment Performed - Open-Hole Completion |
2012-06-03 | Well Began Production |
2012-06-03 | Well Fluid changed to Crude Oil |
2012-06-03 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-18 | Nabors Drilling Limited | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-22 | 1740.00 | Deviate (5 - 79 degrees) |
2012-03-23 | 2115.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-06-03 | Open Hole/Barefoot Completion | 3425.00 | 3430.00 | 0 |
2012-06-03 | Multi-Stage Fracture | 2882.30 | 2882.40 | 0 |
2012-06-03 | Multi-Stage Fracture | 2823.20 | 2823.30 | 0 |
2012-06-03 | Multi-Stage Fracture | 2753.90 | 2754.00 | 0 |
2012-06-03 | Multi-Stage Fracture | 2695.00 | 2695.10 | 0 |
2012-06-03 | Multi-Stage Fracture | 2625.00 | 2625.10 | 0 |
2012-06-03 | Multi-Stage Fracture | 2566.30 | 2566.40 | 0 |
2012-06-03 | Multi-Stage Fracture | 2507.50 | 2507.60 | 0 |
2012-06-03 | Multi-Stage Fracture | 2438.00 | 2438.10 | 0 |
2012-06-03 | Multi-Stage Fracture | 2379.30 | 2379.40 | 0 |
2012-06-03 | Multi-Stage Fracture | 2309.70 | 2309.80 | 0 |
2012-06-03 | Multi-Stage Fracture | 3402.80 | 3402.90 | 0 |
2012-06-03 | Multi-Stage Fracture | 2250.60 | 2250.70 | 0 |
2012-06-03 | Multi-Stage Fracture | 3337.20 | 3337.30 | 0 |
2012-06-03 | Multi-Stage Fracture | 3268.00 | 3268.10 | 0 |
2012-06-03 | Multi-Stage Fracture | 3209.00 | 3209.10 | 0 |
2012-06-03 | Multi-Stage Fracture | 3139.50 | 3139.60 | 0 |
2012-06-03 | Multi-Stage Fracture | 3080.50 | 3080.60 | 0 |
2012-06-03 | Multi-Stage Fracture | 3010.60 | 3010.70 | 0 |
2012-06-03 | Multi-Stage Fracture | 2951.70 | 2951.80 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4268 | 0.0 | 0.0 | 0.0 |
2013 | 8614 | 0.0 | 0.0 | 0.0 |
2014 | 7763 | 0.0 | 0.0 | 0.0 |
2015 | 5802 | 0.0 | 0.0 | 0.0 |
2016 | 8024 | 0.0 | 0.0 | 0.0 |
2017 | 8645 | 0.0 | 0.0 | 0.0 |
2018 | 8265 | 0.0 | 0.0 | 0.0 |
2019 | 7688 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-31 | No Incident Encountered | 0.00 | 0.00 |
2012-06-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]