X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475130905002

Well Details

Well ID: 0475130905002
Loading map...
Location: 00/05-09-047-13W5/2
Location Alias: 00/05-09-47-13 W5M
Location Alias 2: 00/05-09-047-13 W5/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 13
Section: 09
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 5-9-47-13
Operator Name: Cenovus Energy Inc.
License Number: 0207393
License Date: 1997-10-20
License Status: Suspension
Spud Date: 1997-11-03
Final Drill Date: 1997-12-02
Well Total Depth: 3074.00 m
Surface Hole Latitude: 53.037424
Surface Hole Longitude: -115.848617

For data sources see[1][2]

Well History

Date Event
1997-10-20 Obtained License
1997-11-06 Surface Casing Operation Performed
1997-12-02 Finished Drilling
1997-12-02 Well Log Performed
1997-12-02 Well Mode changed to Drilled and Cased
1997-12-03 Well Log Performed
1997-12-07 Production Casing Operation Performed
1997-12-08 Rig Released
1997-12-18 Well Log Performed
1997-12-19 Perforation Treatment Performed - Jet Perforation
1997-12-19 Well Log Performed
1997-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-23 Well Log Performed
1997-12-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-24 Plug Back Performed
1998-01-09 Well Log Performed
1998-01-10 Perforation Treatment Performed - Jet Perforation
1999-07-29 Perforation Treatment Performed - Cement Squeeze
1999-07-29 Plug Back Performed
1999-08-01 Perforation Treatment Performed - Jet Perforation
1999-08-01 Well Log Performed
1999-08-05 Perforation Treatment Performed - Fractured
1999-09-24 Well Began Production
1999-09-24 Well Fluid changed to Gas
1999-09-24 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping
2015-08-01 Well Fluid changed to Gas
2015-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-12-19 Perforation 3032.00 3034.00 20
1999-08-05 Fracture 2965.50 2969.50 0
1997-12-19 Perforation 3041.00 3044.00 20
1997-12-22 Acid Treatment 3032.00 3044.00 0
1997-12-24 Packing Device Capped w/Cement 3018.00 3026.00 0
1998-01-10 Perforation 2524.00 2533.00 20
1998-01-10 Perforation 2535.00 2539.00 20
1998-01-10 Perforation 2549.00 2555.00 20
1999-07-29 Cement Squeeze 2524.00 2555.00 0
1999-08-01 Perforation 2965.50 2969.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 2354 0.0 0.0 0.0
2000 8599 0.0 0.0 0.0
2001 5437 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8061 0.0 0.0 0.0
2004 8654 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8039 0.0 0.0 0.0
2008 7943 0.0 0.0 0.0
2009 8352 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 7179 0.0 0.0 0.0
2012 8225 0.0 0.0 0.0
2013 7523 0.0 0.0 0.0
2014 230 0.0 0.0 0.0
2015 720 0.0 0.0 0.0

For data sources see[5]

References