If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475140206022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.02562,"lon":-115.93582,"icon":""}]} |
Location: 02/06-02-047-14W5/2 | |
Location Alias: 02/06-02-47-14 W5M | |
Location Alias 2: 02/06-02-047-14 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 14 | |
Section: 02 | |
County/Municipality: Yellowhead County | |
Well Name: CVE BRAZR 6-2-47-14 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0193189 | |
License Date: 1996-11-06 | |
License Status: Suspension | |
Spud Date: 1996-11-19 | |
Final Drill Date: 1997-01-13 | |
Well Total Depth: 3782.40 m | |
Surface Hole Latitude: 53.025620 | |
Surface Hole Longitude: -115.935820 |
Date | Event |
---|---|
1996-11-06 | Obtained License |
1996-11-23 | Surface Casing Operation Performed |
1996-12-04 | Direction Drilling Operation Performed - Horizontal |
1996-12-08 | Well Log Performed |
1996-12-19 | Well Log Performed |
1996-12-22 | Production Casing Operation Performed |
1997-01-13 | Finished Drilling |
1997-01-13 | Well Log Performed |
1997-01-13 | Well Mode changed to Drilled and Cased |
1997-01-14 | Well Log Performed |
1997-01-15 | Well Log Performed |
1997-01-16 | Perforation Treatment Performed - Open-Hole Completion |
1997-01-16 | Rig Released |
1997-01-16 | Well Log Performed |
1997-01-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-01-29 | Perforation Treatment Performed - Fractured |
1997-04-22 | Well Log Performed |
1997-05-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-06-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-07-24 | Well Log Performed |
1997-10-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-03-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-03-11 | Plug Back Performed |
2002-03-11 | Well Log Performed |
2002-03-13 | Perforation Treatment Performed - Jet Perforation |
2002-03-13 | Well Log Performed |
2002-03-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-03-19 | Plug Back Performed |
2002-03-19 | Well Log Performed |
2002-03-19 | Well Mode changed to Abandoned Zone |
2002-11-08 | Perforation Treatment Performed - Jet Perforation |
2002-11-12 | Perforation Treatment Performed - Jet Perforation |
2002-11-16 | Perforation Treatment Performed - Fractured |
2002-12-01 | Well Began Production |
2002-12-01 | Well Fluid changed to Gas |
2002-12-01 | Well Mode changed to Flowing |
2003-02-01 | Well Fluid changed to Gas |
2003-02-01 | Well Mode changed to Pumping |
2005-01-13 | Perforation Treatment Performed - Jet Perforation |
2005-01-15 | Perforation Treatment Performed - Fractured |
2016-07-01 | Well Fluid changed to Gas |
2016-07-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-12-04 | 2718.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-01-16 | Open Hole/Barefoot Completion | 3212.00 | 3782.40 | 0 |
2002-11-08 | Perforation | 3092.00 | 3098.00 | 13 |
2002-11-12 | Perforation | 3078.00 | 3085.00 | 13 |
2002-11-16 | Fracture | 3078.00 | 3085.00 | 0 |
2005-01-13 | Perforation | 2452.00 | 2456.00 | 17 |
2005-01-15 | Fracture | 2452.00 | 2456.00 | 0 |
1997-01-25 | Acid Treatment | 3212.00 | 3782.40 | 0 |
1997-01-29 | Fracture | 3212.00 | 3782.40 | 0 |
1997-05-09 | Acid Treatment | 3212.00 | 3782.40 | 0 |
1997-06-19 | Acid Treatment | 3212.00 | 3782.40 | 0 |
1997-10-20 | Acid Treatment | 3212.00 | 3782.40 | 0 |
2002-03-11 | Packing Device Capped w/Cement | 3159.00 | 3167.00 | 0 |
2002-03-13 | Perforation | 3092.00 | 3098.00 | 13 |
2002-03-19 | Packing Device Capped w/Cement | 3075.00 | 3090.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 72 | 0.0 | 0.0 | 0.0 |
2003 | 1511 | 0.0 | 0.0 | 0.0 |
2004 | 3304 | 0.0 | 0.0 | 0.0 |
2005 | 744 | 0.0 | 0.0 | 0.0 |
2008 | 720 | 0.0 | 0.0 | 0.0 |
2011 | 672 | 0.0 | 0.0 | 0.0 |
For data sources see[6]