X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475141211000

Well Details

Well ID: 0475141211000
Loading map...
Location: 00/11-12-047-14W5/0
Location Alias: 00/11-12-47-14 W5M
Location Alias 2: 00/11-12-047-14 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 14
Section: 12
County/Municipality: Yellowhead County
Well Name: BOULDER BRAZR 11-12-47-14
Operator Name: Boulder Energy Ltd.
License Number: 0092770
License Date: 1981-10-16
License Status: Suspension
Spud Date: 1981-10-24
Final Drill Date: 1981-12-14
Well Total Depth: 3777.00 m
Surface Hole Latitude: 53.041304
Surface Hole Longitude: -115.918746

For data sources see[1][2]

Well History

Date Event
1981-10-16 Obtained License
1981-11-12 Drill Stem Test Performed
1981-11-29 Well Log Performed
1981-12-02 Drill Stem Test Performed
1981-12-06 Production Casing Operation Performed
1981-12-11 Drill Stem Test Performed
1981-12-14 Finished Drilling
1981-12-14 Well Mode changed to Drilled and Cased
1981-12-15 Well Log Performed
1981-12-18 Drill Stem Test Performed
1982-02-16 Perforation Treatment Performed - Jet Perforation
1982-02-16 Well Log Performed
1982-02-17 Well Log Performed
1982-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-19 Perforation Treatment Performed - Jet Perforation
1982-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-23 Perforation Treatment Performed - Jet Perforation
1982-02-23 Well Began Production
1982-02-23 Well Fluid changed to Crude Oil
1982-02-23 Well Mode changed to Flowing
1984-06-28 Perforation Treatment Performed - Fractured
1987-03-28 Perforation Treatment Performed - Jet Perforation
1987-03-28 Well Log Performed
1987-03-29 Perforation Treatment Performed - Jet Perforation
1987-03-31 Perforation Treatment Performed - Cement Squeeze
1987-04-03 Perforation Treatment Performed - Open-Hole Completion
1987-04-04 Liner Casing Operation Performed
1987-04-04 Perforation Treatment Performed - Cement Squeeze
1987-04-04 Plug Back Performed
1987-04-04 Well Fluid changed to Crude Oil
1987-04-04 Well Mode changed to Abandoned Zone
1987-04-06 Perforation Treatment Performed - Open-Hole Completion
1987-04-09 Perforation Treatment Performed - Jet Perforation
1987-04-09 Well Log Performed
1987-04-11 Well Log Performed
1987-04-23 Well Log Performed
1987-04-25 Perforation Treatment Performed - Jet Perforation
1987-04-30 Perforation Treatment Performed - Remedial Casing
1987-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-13 Well Log Performed
1997-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-29 Well Log Performed
2004-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-12-28 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-02-16 Perforation 3149.00 3153.00 3
1987-03-28 Perforation 3040.00 3045.00 7
1987-03-29 Perforation 3140.50 3142.00 3
1987-03-29 Perforation 3149.00 3153.00 3
1987-03-31 Cement Squeeze 3040.00 3045.00 0
1987-04-03 Open Hole/Barefoot Completion 3589.00 3670.00 0
1987-04-04 Cement Squeeze 2454.50 3670.00 0
1987-04-06 Open Hole/Barefoot Completion 3670.00 3725.00 0
1987-04-09 Perforation 3680.00 3691.00 13
1987-04-25 Perforation 972.00 972.80 13
1987-04-30 Remedial Casing Cementing 972.00 972.80 0
1982-02-16 Perforation 3140.50 3142.00 3
1987-05-05 Acid Treatment 3670.00 3725.00 0
1997-05-18 Acid Treatment 3670.00 3710.00 0
2004-05-22 Acid Treatment 3670.00 3725.00 0
2004-07-20 Acid Treatment 3670.00 3725.00 0
2004-12-28 Acid Treatment 3670.00 3725.00 0
1982-02-18 Packing Device Capped w/Cement 3126.00 3134.00 0
1982-02-19 Perforation 3040.00 3045.00 7
1982-02-20 Acid Treatment 3040.00 3045.00 0
1982-02-21 Packing Device Capped w/Cement 3026.00 3034.00 0
1982-02-23 Perforation 2454.50 2455.50 13
1982-02-23 Perforation 2457.00 2459.00 13
1984-06-28 Fracture 2454.50 2459.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2151 0.0 0.0 0.0
1983 2259 0.0 0.0 0.0
1984 4207 0.0 0.0 0.0
1985 2812 0.0 0.0 0.0
1986 3981 0.0 0.0 0.0
1987 998 0.0 0.0 0.0

For data sources see[5]

References