X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475141705022

Well Details

Well ID: 0475141705022
Loading map...
Location: 02/05-17-047-14W5/2
Location Alias: 02/05-17-47-14 W5M
Location Alias 2: 02/05-17-047-14 W5/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 14
Section: 17
County/Municipality: Yellowhead County
Well Name: BOULDER BRAZR 14-16-47-14
Operator Name: Boulder Energy Ltd.
License Number: 0412997
License Date: 2009-10-08
License Status: Amended
Spud Date: 2015-05-06
Final Drill Date: 2015-05-21
Well Total Depth: 4313.00 m
Surface Hole Latitude: 53.050216
Surface Hole Longitude: -115.983783

For data sources see[1][2]

Well History

Date Event
2009-10-08 Obtained License
2015-05-10 Direction Drilling Operation Performed - Deviate
2015-05-15 Direction Drilling Operation Performed - Horizontal
2015-05-21 Finished Drilling
2015-05-21 Well Log Performed
2015-05-21 Well Mode changed to Drilled and Cased
2015-05-23 Liner Casing Operation Performed
2015-05-24 Rig Released
2015-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2015-05-29 Perforation Treatment Performed - Open-Hole Completion
2015-06-12 Well Fluid changed to Crude Oil
2015-06-12 Well Mode changed to Drilling and Completing
2015-07-01 Well Began Production
2015-07-01 Well Fluid changed to Crude Oil
2015-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-05-06 Precision Drilling Technology Services Group Inc. 382 4385 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-05-10 1466.40 Deviate (5 - 79 degrees)
2015-05-15 1870.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-05-29 Open Hole/Barefoot Completion 4308.00 4313.00 0
2015-05-29 Multi-Stage Fracture 2981.70 2981.80 0
2015-05-29 Multi-Stage Fracture 2888.40 2888.50 0
2015-05-29 Multi-Stage Fracture 2780.30 2780.40 0
2015-05-29 Multi-Stage Fracture 2684.00 2684.10 0
2015-05-29 Multi-Stage Fracture 2590.60 2590.70 0
2015-05-29 Multi-Stage Fracture 2482.30 2482.40 0
2015-05-29 Multi-Stage Fracture 2389.90 2390.00 0
2015-05-29 Multi-Stage Fracture 2308.70 2308.80 0
2015-05-29 Multi-Stage Fracture 2107.40 2107.50 0
2015-05-29 Multi-Stage Fracture 2040.80 2040.90 0
2015-05-29 Multi-Stage Fracture 4296.80 4296.90 0
2015-05-29 Multi-Stage Fracture 1935.50 1935.60 0
2015-05-29 Multi-Stage Fracture 4212.20 4212.30 0
2015-05-29 Multi-Stage Fracture 4121.40 4121.50 0
2015-05-29 Multi-Stage Fracture 3888.70 3888.80 0
2015-05-29 Multi-Stage Fracture 3784.50 3784.60 0
2015-05-29 Multi-Stage Fracture 3690.30 3690.40 0
2015-05-29 Multi-Stage Fracture 3382.80 3382.90 0
2015-05-29 Multi-Stage Fracture 3087.10 3087.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-05-29 2015-05-29 1,781 853 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 23.1043 N/A
water Not Available 100 44.5576 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 30.6016 N/A
FCB-1 Trican Breaker severely refined mineral oil Trade Secret 100 0.0558 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.0833 N/A
non-hazardous ingredients Not Available 100 0.0833 N/A
FC-1 Trican Surfactant isopropanol 67-63-0 100 0.8519 N/A
N.N.N-dimethyl-1-octadecanamine 124-28-7 100 0.8519 N/A
N.N.N-dimethyl-1-octadecanamine-HCL 1613-17-8 100 0.8519 N/A
N.N.N-trimethyl-1-octadecaminium chloride 112-03-8 100 0.8519 N/A
FC-2 Trican Surfactant organic salt 9292 100 0.7451 N/A
water Not Available 100 0.7451 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-05-26 2015-05-28 Central Water Distribution Facility 988

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 4095 0.0 0.0 0.0
2016 8471 0.0 0.0 0.0
2017 8017 0.0 0.0 0.0
2018 5667 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-05-24 No Incident Encountered 0.00 0.00
2015-06-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References