X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475142302002

Well Details

Well ID: 0475142302002
Loading map...
Location: 00/02-23-047-14W5/2
Location Alias: 00/02-23-47-14 W5M
Location Alias 2: 00/02-23-047-14 W5/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 14
Section: 23
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 2-23-47-14
Operator Name: Cenovus Energy Inc.
License Number: 0186507
License Date: 1996-03-04
License Status: Issued
Spud Date: 1996-03-11
Final Drill Date: 1996-04-03
Well Total Depth: 3140.00 m
Surface Hole Latitude: 53.064745
Surface Hole Longitude: -115.935196

For data sources see[1][2]

Well History

Date Event
1996-03-04 Obtained License
1996-03-11 Lost Circulation Occurred
1996-03-14 Surface Casing Operation Performed
1996-03-26 Drill Stem Test Performed
1996-04-03 Finished Drilling
1996-04-03 Well Mode changed to Drilled and Cased
1996-04-05 Well Log Performed
1996-04-06 Well Log Performed
1996-04-07 Production Casing Operation Performed
1996-04-09 Rig Released
1996-04-24 Well Log Performed
1996-04-25 Perforation Treatment Performed - Jet Perforation
1996-04-25 Well Log Performed
1996-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-30 Perforation Treatment Performed - Jet Perforation
1996-04-30 Well Log Performed
1996-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-06 Well Log Performed
1996-05-08 Perforation Treatment Performed - Jet Perforation
1996-05-08 Well Log Performed
1996-05-17 Well Log Performed
1996-05-20 Well Log Performed
1996-05-23 Perforation Treatment Performed - Fractured
1996-09-01 Well Began Production
1996-09-01 Well Fluid changed to Gas
1996-09-01 Well Mode changed to Flowing
1997-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-09-01 Well Fluid changed to Gas
2004-09-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-04-25 Perforation 3117.00 3119.00 20
1996-04-28 Acid Treatment 3117.00 3119.00 0
1996-04-30 Perforation 3104.50 3111.00 20
1996-04-30 Perforation 3113.00 3114.00 20
1996-05-01 Acid Treatment 3104.50 3119.00 0
1996-05-08 Perforation 2993.00 2999.00 20
1996-05-23 Fracture 2993.00 2999.00 0
1997-04-13 Acid Treatment 3104.50 3119.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2734 0.0 0.0 0.0
1997 8476 0.0 0.0 0.0
1998 8682 0.0 0.0 0.0
1999 8227 0.0 0.0 0.0
2000 8578 0.0 0.0 0.0
2001 8129 0.0 0.0 0.0
2002 8685 0.0 0.0 0.0
2003 8396 0.0 0.0 0.0
2004 8623 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8205 0.0 0.0 0.0
2007 8137 0.0 0.0 0.0
2008 8399 0.0 0.0 0.0
2009 8567 0.0 0.0 0.0
2010 8640 0.0 0.0 0.0
2011 7747 0.0 0.0 0.0
2012 8280 0.0 0.0 0.0
2013 8276 0.0 0.0 0.0
2014 8447 0.0 0.0 0.0
2015 7869 0.0 0.0 0.0
2016 8506 0.0 0.0 0.0
2017 8722 0.0 0.0 0.0
2018 8591 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 1566 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-03-11 Lost Circulation 90.00 659.00

For data sources see[6]

References