Well ID: 0475151106000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.037176,"lon":-116.088592,"icon":""}]} |
Location: 00/06-11-047-15W5/0 | |
Location Alias: 00/06-11-47-15 W5M | |
Location Alias 2: 00/06-11-047-15 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 15 | |
Section: 11 | |
County/Municipality: Yellowhead County | |
Well Name: CVE BRAZR 6-11-47-15 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0177761 | |
License Date: 1995-05-08 | |
License Status: Suspension | |
Spud Date: 1995-05-28 | |
Final Drill Date: 1995-07-06 | |
Well Total Depth: 3335.00 m | |
Surface Hole Latitude: 53.037176 | |
Surface Hole Longitude: -116.088592 |
Date | Event |
---|---|
1995-05-08 | Obtained License |
1995-05-31 | Surface Casing Operation Performed |
1995-06-06 | Lost Circulation Occurred |
1995-06-08 | Lost Circulation Occurred |
1995-07-06 | Finished Drilling |
1995-07-10 | Production Casing Operation Performed |
1995-07-11 | Rig Released |
1995-08-18 | Perforation Treatment Performed - Open-Hole Completion |
1995-08-19 | Well Log Performed |
1995-08-20 | Well Log Performed |
1995-08-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-04-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-04-08 | Plug Back Performed |
1997-04-08 | Well Mode changed to Abandoned and Whipstocked |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-08-18 | Open Hole/Barefoot Completion | 3292.00 | 3335.00 | 0 |
1995-08-26 | Acid Treatment | 3303.00 | 3317.80 | 0 |
1997-04-08 | Packing Device Capped w/Cement | 3276.00 | 3284.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1995-06-06 | Lost Circulation | 1250.00 | 1281.00 |
1995-06-08 | Lost Circulation | 1413.00 | 1490.00 |
For data sources see[5]